<div><div><div property="content:encoded">
<div>
<h2>Construction Contracts FY2019</h2>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontracts">FY2020 Construction Contracts Awarded</a></p>
<p>FY2019: <span> </span> Construction Contracts awarded for a total value of <span> </span></p>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy18">FY2018 Construction Contracts Awarded</a></p>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy17">FY2017 Construction Contracts Awarded</a></p>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy16">FY2016 Construction Contracts Awarded</a></p>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy15">FY2015 Construction Contracts Awarded</a></p>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy14">FY2014 Construction Contracts Awarded</a></p>
<p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy13">FY2013 Construction Contracts Awarded</a></p>
<p>The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.</p>
<p>To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000.</p>
<p>To view a contract, click on the Contract Number for the desired project.</p>
<p> </p>
<ul>
<li><a href="https://www.sandiego.gov/cip/reports/consultantcontracts">View A&E and Other Contracts</a></li>
<li><a href="https://www.sandiego.gov/cip/reports/minor-repair-contracts">View Minor Repair Contracts</a></li>
</ul>
<p> </p>
<table>
<thead>
<tr>
<th width="11%">Contract Number</th>
<th>Contract Name</th>
<th>Award Date</th>
<th>Award Amount</th>
<th>Contractor</th>
<th>No. of Bidders</th>
<th>Contact</th>
</tr>
</thead>
<tbody>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1806-dbb-3.pdf" type="application/pdf; length=51190910"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1806-DBB-3</a></span></td>
<td>AC Water & Sewer Group 1013</td>
<td align="center">06/27/2019</td>
<td align="center">$13,321,934.12</td>
<td>TC Construction Company, Inc.</td>
<td align="center">7</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1834-dbbb-3.pdf" type="application/pdf; length=35510644"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1834-DBB-3</a></span></td>
<td>AC Water Group 1030</td>
<td align="center">06/27/2019</td>
<td align="center">$5,797,207.70</td>
<td>KTA Construction, Inc.</td>
<td align="center">6</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1737-dbb-3.pdf" type="application/pdf; length=31977173"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1737-DBB-3</a></span></td>
<td>AC Water and Sewer Group 1042</td>
<td align="center">06/21/2019</td>
<td align="center">$8,190,400.00</td>
<td>S.C. Valley Engineering, Inc.</td>
<td align="center">5</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1805-dbb-3.pdf" type="application/pdf; length=26813943"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1805-DBB-3</a></span></td>
<td>AC Water & Sewer Group 1027</td>
<td align="center">06/19/2019</td>
<td align="center">$5,772,761.00</td>
<td>Burtech Pipeline Incorporated</td>
<td align="center">8</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1823-dbb-3.pdf" type="application/pdf; length=9771823"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1823-DBB-3</a></span></td>
<td>Mission Cliff Dr Water & Sewer Main Replacement</td>
<td align="center">06/10/2019</td>
<td align="center">$1,757,519.00</td>
<td>Piperin Corporation</td>
<td align="center">8</td>
<td><a href="mailto:CSuarez@sandiego.gov">Celina Suarez</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1799-dbb-3.pdf" type="application/pdf; length=38907888"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1799-DBB-3</a></span></td>
<td>Pipeline Rehabilitation AW-1</td>
<td align="center">06/04/2019</td>
<td align="center">$3,252,622.20</td>
<td>Burtech Pipeline</td>
<td align="center">3</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1787-dbb-3.pdf" type="application/pdf; length=50253699"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1787-DBB-3</a></span></td>
<td>Sewer and AC Water Group 797</td>
<td align="center">06/04/2019</td>
<td align="center">$3,701,229.80</td>
<td>El Cajon Grading & Engineering Co, Inc.</td>
<td align="center">4</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1795-dbb-3.pdf" type="application/pdf; length=6485161"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1795-DBB-3</a></span></td>
<td>Carmel Creek Neighborhood Park Improvements</td>
<td align="center">06/03/2019</td>
<td align="center">$1,023,849.51</td>
<td>Atlas Development</td>
<td align="center">9</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1796-dbb-3.pdf" type="application/pdf; length=19279989"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1796-DBB-3</a></span></td>
<td>Slurry Seal Group 1923</td>
<td align="center">05/30/2019</td>
<td align="center">$2,668,208.87</td>
<td>American Asphalt South, Inc.</td>
<td align="center">3</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1767-dbb-3-eb.pdf" type="application/pdf; length=41878877"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1767-DBB-3</a></span></td>
<td>EB Scripps Park Comfort Station</td>
<td align="center">05/22/2019</td>
<td align="center">$3,217,646.12</td>
<td>Atlas Development Corporation</td>
<td align="center">8</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1802-dbb-3.pdf" type="application/pdf; length=20878049"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1802-DBB-3</a></span></td>
<td>MBC Cooling Water System Chiller Upgrade</td>
<td align="center">05/23/2019</td>
<td align="center">$2,915,726.83</td>
<td>TechCom International, Corp.</td>
<td align="center">9</td>
<td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1794-dbb-3.pdf" type="application/pdf; length=27919270"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1794-DBB-3</a></span></td>
<td>Pipeline Rehabilitation AL-1</td>
<td align="center">05/21/2019</td>
<td align="center">$3,034,166.00</td>
<td>Southwest Pipeline and Trenchless Corp.</td>
<td align="center">3</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1820-emr-3.pdf" type="application/pdf; length=2962232"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1820-EMR-3</a></span></td>
<td>Cardinal Dr. Storm Drain Replacement</td>
<td align="center">05/20/2019</td>
<td align="center">$1,000,000.00</td>
<td>Flat Iron West, Inc.</td>
<td align="center">N/A</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1827-emr-3.pdf" type="application/pdf; length=4358300"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1827-EMR-3</a></span></td>
<td>Emergency Construction Services For: Civic Theater Water Line</td>
<td align="center">05/16/2019</td>
<td align="center">$1,200,000.00</td>
<td>TC Construction Company, Inc.</td>
<td align="center">N/A</td>
<td><a href="mailto:CSuarez@sandiego.gov">Celina Suarez</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1804-dbb-3.pdf" type="application/pdf; length=41788943"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1804-DBB-3</a></span></td>
<td>Sewer & AC Water Group 807</td>
<td align="center">05/10/2019</td>
<td align="center">$10,447,975.59</td>
<td>Burtech Pipeline Inc.</td>
<td align="center">3</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1793-dbb-3.pdf" type="application/pdf; length=9163058"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1793-DBB-3</a></span></td>
<td>Richmond Street Sidewalk Improvements Project & Uptown Lining CMP Storm Drain</td>
<td align="center">05/08/2019</td>
<td align="center">$491,468.00</td>
<td>Crest Equipment, Inc.</td>
<td align="center">5</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1831-emr-1.pdf" type="application/pdf; length=4035639"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1831-EMR-1</a></span></td>
<td>3030 32nd St. Storm Drain</td>
<td align="center">05/06/2019</td>
<td align="center">$150,000.00</td>
<td>Burtech Pipeline, Inc.</td>
<td align="center">1</td>
<td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/l-19-1782-dbb-3.pdf" type="application/pdf; length=23801762"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-19-1782-DBB-3</a></span></td>
<td>ADA SW La Jolla Shores & Calle Corta</td>
<td align="center">05/02/2019</td>
<td align="center">$236,530.00</td>
<td>Blue Pacific Engineering & Construction</td>
<td align="center">4</td>
<td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1790-dbb-3.pdf" type="application/pdf; length=9066113"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1790-DBB-3</a></span></td>
<td>Sewer Group Job 830</td>
<td align="center">05/02/2019</td>
<td align="center">$567,768.40</td>
<td>Piperin Corporation</td>
<td align="center">3</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1724-dbb-3.pdf" type="application/pdf; length=70679671"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1724-DBB-3</a></span></td>
<td>North City Water Reclamation Plant Expansion – Early Site Work and Ozone/BAC Relocation</td>
<td align="center">04/23/2019</td>
<td align="center">$16,403,300.00</td>
<td>AECOM Energy & Construction, Inc.</td>
<td align="center">2</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1822-emr-3.pdf" type="application/pdf; length=3867842"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1822-EMR-3</a></span></td>
<td>Florida Dr. Storm Drain Replacement</td>
<td align="center">04/23/2019</td>
<td align="center">$1,300,000.00</td>
<td>Hazard Construction Company</td>
<td align="center">1</td>
<td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1830-emr-3.pdf" type="application/pdf; length=5684602"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1830-EMR-3</a></span></td>
<td>Wellborn Street Storm Drain</td>
<td align="center">04/10/2019</td>
<td align="center">$500,000.00</td>
<td>TC Construction, Inc.</td>
<td align="center">1</td>
<td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1781-dbb-3.pdf" type="application/pdf; length=12716253"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1781-DBB-3</a></span></td>
<td>Water and Sewer Group 967</td>
<td align="center">04/09/2019</td>
<td align="center">$813,469.00</td>
<td>Burtech Pipeline Inc.</td>
<td align="center">4</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1828-emr-2.pdf" type="application/pdf; length=9281959"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1828-EMR-2</a></span></td>
<td>South Woodman Storm Drain Emergency</td>
<td align="center">04/09/2019</td>
<td align="center">$500,000.00</td>
<td>Cass Construction dba Cass Arrieta</td>
<td align="center">N/A</td>
<td><a href="mailto:CSuarez@sandiego.gov">Celina Suarez</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1819-emr-3.pdf" type="application/pdf; length=4308775"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1819-EMR-3</a></span></td>
<td>1925 Burroughs Storm Drain Replacement</td>
<td align="center">03/19/2019</td>
<td align="center">$500,000.00</td>
<td>Granite Construction Company</td>
<td align="center">1</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1816-sls-1.pdf" type="application/pdf; length=6642950"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1816-SLS-1</a></span></td>
<td>Sole Source Construction Services for Repair Services for Alpha Project Homeless Shelter</td>
<td align="center">02/19/2019</td>
<td align="center">$105,852.29</td>
<td>Bill Thorpe Heating & Air</td>
<td align="center">N/A</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1766-dbb-3.pdf" type="application/pdf; length=76119540"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1766-DBB-3</a></span></td>
<td>Pipeline Rehabilitation AU-1</td>
<td align="center">02/13/2019</td>
<td align="center">$3,326,618.10</td>
<td>Southwest Pipeline and Trenchless Corp.</td>
<td align="center">5</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1757-dbb-3.pdf" type="application/pdf; length=73219997"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1757-DBB-3</a></span></td>
<td>Sewer and AC Water Group 697A</td>
<td align="center">02/08/2019</td>
<td align="center">$4,910,682.06</td>
<td>Burtech Pipeline</td>
<td align="center">6</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1780-dbb-3.pdf" type="application/pdf; length=23507015"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1780-DBB-3</a></span></td>
<td>Miramar Landfill Storm Water Conveyance Improvements</td>
<td align="center">02/01/2019</td>
<td align="center">$2,030,405.06</td>
<td>Dick Miller Inc.</td>
<td align="center">4</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/l-19-1771-dbb-2.pdf" type="application/pdf; length=12635068"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-19-1771-DBB-2</a></span></td>
<td>Dulzura Conduit Repairs</td>
<td align="center">01/30/2019</td>
<td align="center">$328,500.00</td>
<td>New Century Construction Inc.</td>
<td align="center">5</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1777-db1-2.pdf" type="application/pdf; length=13806974"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1777-DB1-2</a></span></td>
<td>Furnish and Install New Laboratory Trailer at Pump Station 1</td>
<td align="center">01/30/2019</td>
<td align="center">$294,465.00</td>
<td>Martin Resnik Construction Co.</td>
<td align="center">2</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1727-dbb-3.pdf" type="application/pdf; length=35995166"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1727-DBB-3</a></span></td>
<td>Curb Ramp Installation and Resurfacing</td>
<td align="center">01/30/2019</td>
<td align="center">$4,035,095.14</td>
<td>Superior Ready Mix Concrete, L.P.</td>
<td align="center">4</td>
<td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1785-dbb-3.pdf" type="application/pdf; length=8940852"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1785-DBB-3</a></span></td>
<td>Chollas Community Park Comfort Station</td>
<td align="center">01/29/2019</td>
<td align="center">$2,267,803.00</td>
<td>Marcon Engineering, Inc.</td>
<td align="center">5</td>
<td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1784-dbb-3.pdf" type="application/pdf; length=17218532"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1784-DBB-3</a></span></td>
<td>Mira Mesa Trunk Sewer Improvement</td>
<td align="center">01/28/2019</td>
<td align="center">$6,173,717.00</td>
<td>Orion Construction Corporation</td>
<td align="center">4</td>
<td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1762-dbb-3-a.pdf" type="application/pdf; length=30406765"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1762-DBB-3-A</a></span></td>
<td>Bay Terraces Senior Center</td>
<td align="center">01/23/2019</td>
<td align="center">$3,990,606.00</td>
<td>Fordyce Construction, Inc.</td>
<td align="center">6</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1560-dbb-3.pdf" type="application/pdf; length=40799399"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1560-DBB-3</a></span></td>
<td>California Tower Seismic Retrofit</td>
<td align="center">1/22/2019</td>
<td align="center">$4,710,500.00</td>
<td>SOLPAC Construction, Inc.</td>
<td align="center">4</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1772-joc-3.pdf" type="application/pdf; length=3348198"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1772-JOC-3</a></span></td>
<td>JOC S18 Sitework</td>
<td align="center">01/22/2019</td>
<td align="center">$5,000,000.00</td>
<td>Ramona Paving & Construction Corp.</td>
<td align="center">4</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1814-sls-1.pdf" type="application/pdf; length=626867"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1814-SLS-1</a></span></td>
<td>Sole-Source Construction Services for Repair Services for Alpha Project Homeless Shelter</td>
<td align="center">01/22/2019</td>
<td align="center">$40,000.00</td>
<td>Tiffany Structures Inc.</td>
<td align="center">N/A</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/l-19-1774-joc-2.pdf" type="application/pdf; length=1605950"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-19-1774-JOC-2</a></span></td>
<td>Job Order Contract (JOC) SLBE SS18 Sitework</td>
<td align="center">01/15/2019</td>
<td align="center">$500,000.00</td>
<td>Moshiri Enterprises, dba Delta Builders</td>
<td align="center">4</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1773-emr-3.pdf" type="application/pdf; length=2867401"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1773-EMR-3</a></span></td>
<td>Ladera St Beach Access Stairway Coastal Bluff Stabilization</td>
<td align="center">01/09/2019</td>
<td align="center">$1,500,000.00</td>
<td>Orion Construction Corporation</td>
<td align="center">N/A</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1763-dbb-3.pdf" type="application/pdf; length=13610586"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1763-DBB-3</a></span></td>
<td>Otay Water Treatment Plant Basin No. 1 Concrete Restoration</td>
<td align="center">01/04/2019</td>
<td align="center">$1,170,625.00</td>
<td>Blue Pacific Engineering & Construction</td>
<td align="center">6</td>
<td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1503-dbb-2-a.pdf" type="application/pdf; length=13607352"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1503A-DBB-2</a></span></td>
<td>Camino Del Este Path Crossing Improvements</td>
<td align="center">01/02/2019</td>
<td align="center">$360,000.00</td>
<td>HMS Construction Corporation</td>
<td align="center">4</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1770-dbb-3.pdf" type="application/pdf; length=11442094"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1770-DBB-3</a></span></td>
<td>Slurry Seal Group 1902</td>
<td align="center">12/21/2018</td>
<td align="center">$2,348,232.04</td>
<td>American Asphalt South, Inc.</td>
<td align="center">2</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1775-dbb-3.pdf" type="application/pdf; length=49466575"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1775-DBB-3</a></span></td>
<td>Pipeline Rehabilitation AP-1</td>
<td align="center">12/13/2018</td>
<td align="center">$2,027,181.79</td>
<td>Southwest Pipeline and Trenchless Corp.</td>
<td align="center">3</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1691-dbb-3.pdf" type="application/pdf; length=21761666"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1691-DBB-3</a></span></td>
<td>Block 7G2 UUP</td>
<td align="center">11/6/2018</td>
<td align="center">$8,176,735.68</td>
<td>Southern Contracting Company</td>
<td align="center">4</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-17-1518-mac-3.pdf" type="application/pdf; length=96892108"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-17-1518-MAC-3</a></span></td>
<td>Multiple Award Design-Build Contracts (MACC) for Water, Wastewater, Stormwater Pipeline Projects</td>
<td align="center">10/31/2018</td>
<td align="center"> </td>
<td>Burtech Pipeline Inc.; KTA Construction, Inc.; Orion Construction Corporation; Shimmick Construction Company, Inc.; TC Construction Company, Inc.</td>
<td align="center">6</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1750-joc-3.pdf" type="application/pdf; length=4487385"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1750-JOC-3</a></span></td>
<td>M17 Mechanical Systems</td>
<td align="center">10/26/2018</td>
<td align="center">$4,500,000.00</td>
<td>DuWright Construction, Inc.</td>
<td align="center">2</td>
<td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1768-sls-1.pdf" type="application/pdf; length=3393807"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1768-SLS-1</a></span></td>
<td>Wetland Restoration and Biological Monitoring Services for Famosa</td>
<td align="center">10/23/2018</td>
<td align="center">$170,000.00</td>
<td>Dudek</td>
<td align="center">1</td>
<td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1719-dbb-3.pdf" type="application/pdf; length=81618017"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1719-DBB-3</a></span></td>
<td>Pipeline Rehabilitation AO-1</td>
<td align="center">10/22/2018</td>
<td align="center">$3,074,886.10</td>
<td>Burtech Pipeline Incorporated</td>
<td align="center">2</td>
<td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1555-dbb-3-a.pdf" type="application/pdf; length=32927837"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1555-DBB-3-A</a></span></td>
<td>Van Dyke Storm Drain Replacement</td>
<td align="center">10/19/2018</td>
<td align="center">$979,077.65</td>
<td>Cass Construction Inc.</td>
<td align="center">10</td>
<td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1764-dbb-3.pdf" type="application/pdf; length=38147749"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1764-DBB-3</a></span></td>
<td>DMP 1 & 2 Cycle Track Interim Implementation</td>
<td align="center">10/19/2018</td>
<td align="center">$2,011,719.53</td>
<td>Blue Pacific Engineering & Construction</td>
<td align="center">1</td>
<td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1747-dbb-3.pdf" type="application/pdf; length=9605233"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1747-DBB-3</a></span></td>
<td>Balboa Avenue Corridor Improvements</td>
<td align="center">10/8/2018</td>
<td align="center">$1,394,999.41</td>
<td>Dick Miller, Inc.</td>
<td align="center">6</td>
<td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1760-joc-3.pdf" type="application/pdf; length=3727813"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1760-JOC-3</a></span></td>
<td>Job Order Contract (JOC) E17 Electrical Systems</td>
<td align="center">10/8/2018</td>
<td align="center">$4,500,000.00</td>
<td>Global Power Group, Inc.</td>
<td align="center">3</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1755-dbb-3.pdf" type="application/pdf; length=58203362"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1755-DBB-3</a></span></td>
<td>Slurry Seal Group 1901</td>
<td align="center">10/4/2018</td>
<td align="center">$3,231,436.61</td>
<td>American Asphalt South, Inc.</td>
<td align="center">3</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/l-18-1733-joc-2.pdf" type="application/pdf; length=3215800"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-18-1733-JOC-2</a></span></td>
<td>SLBE TS18 Street Lighting/Traffic Signals</td>
<td align="center">10/4/2018</td>
<td align="center">$500,000.00</td>
<td>Southwest Traffic Signal Service, Inc.</td>
<td align="center">4</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1711-dbb-3.pdf" type="application/pdf; length=7213718"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1711-DBB-3</a></span></td>
<td>Skyline Hills Community Park ADA Upgrades</td>
<td align="center">9/14/2018</td>
<td align="center">$1,674,620.00</td>
<td>Fordyce Construction Inc.</td>
<td align="center">6</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1761-dbb-3.pdf" type="application/pdf; length=35335427"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1761-DBB-3</a></span></td>
<td>Sidewalk Replacement Group 1603</td>
<td align="center">9/11/2018</td>
<td align="center">$881,231.00</td>
<td>LC Paving and Sealing, Inc.</td>
<td align="center">3</td>
<td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1543-joc-3-north.pdf" type="application/pdf; length=5274120"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1543-JOC-3</a></span></td>
<td>
<p>SP17 Street Paving for Capital Improvements Projects Only <span>(NORTH Of I-8)</span></p>
</td>
<td align="center">9/6/2018</td>
<td align="center">$10,000,000.00</td>
<td>TC Construction Company, Inc.</td>
<td align="center">4</td>
<td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1543-joc-3-south.pdf" type="application/pdf; length=4220156"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1543-JOC-3</a></span></td>
<td>
<p>SP17 Street Paving for Capital Improvements Projects Only <span>(SOUTH Of I-8)</span></p>
</td>
<td align="center">9/6/2018</td>
<td align="center">$10,000,000.00</td>
<td>SRM Contracting & Paving</td>
<td align="center">4</td>
<td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1732-dbb-3.pdf" type="application/pdf; length=55522643"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1732-DBB-3</a></span></td>
<td>Fire Rescue Air Operations Facility</td>
<td align="center">8/24/2018</td>
<td align="center">$3,214,544.00</td>
<td>EC Constructors</td>
<td align="center">4</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1586-dbb-3-a.pdf" type="application/pdf; length=81002876"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1586-DBB-3-A</a></span></td>
<td>101 Ash Street Tenant Improvements</td>
<td align="center">8/21/2018</td>
<td align="center">$17,080,261.00</td>
<td>West Coast General Corporation</td>
<td align="center">3</td>
<td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1707-dbb-3.pdf" type="application/pdf; length=13993770"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1707-DBB-3</a></span></td>
<td>Miramar Landfill Gas Recovery Improvements</td>
<td align="center">8/10/2018</td>
<td align="center">$8,218,374.00</td>
<td>NEO San Diego LLC & Aptim Environmental & Infrastructure, Inc.</td>
<td align="center">1</td>
<td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1696-dbb-3.pdf" type="application/pdf; length=9021777"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1696-DBB-3</a></span></td>
<td>Concrete Street Panel Group 1601</td>
<td align="center">8/10/2018</td>
<td align="center">$2,535,450.00</td>
<td>Portillo Concrete, Inc.</td>
<td align="center">5</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1740-dbb-3.pdf" type="application/pdf; length=22183879"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1740-DBB-3</a></span></td>
<td>Rolling Hills Neighborhood Park ADA Upgrade</td>
<td align="center">8/8/2018</td>
<td align="center">
<p>$1,537,650.00</p>
</td>
<td>JMJ Construction</td>
<td align="center">8</td>
<td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-6888-joc-3-a.pdf" type="application/pdf; length=18083780"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-6888-JOC-3-A </a></span></td>
<td>Work In Private Property For Utilities Underground</td>
<td align="center">8/1/2018</td>
<td align="center">
<p>$15,000,000.00</p>
</td>
<td>Ramona Paving & Construction Corp.</td>
<td align="center">3</td>
<td><a href="mailto:angelicag@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1697-dbb-3_solicitation_final.pdf" type="application/pdf; length=13168121"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1697-DBB-3</a></span></td>
<td>Rancho Mission Canyon Park ADA Upgrades</td>
<td align="center">7/24/2018</td>
<td align="center">
<p>$1,650,868.00</p>
</td>
<td>R.E. Schultz Construction, Inc.</td>
<td align="center">8</td>
<td><a href="mailto:angelicag@sandiego.gov">Angelica Gil</a></td>
</tr>
<tr>
<td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1746-dbb-3_-_contract_document.pdf" type="application/pdf; length=28373022"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1746-DBB-3</a></span></td>
<td>Palm Avenue Transitional Housing</td>
<td align="center">7/18/2018</td>
<td align="center">
<p>$5,397,073.00</p>
</td>
<td>West Coast General Corporation</td>
<td align="center">3</td>
<td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td>
</tr>
</tbody>
</table>
<p>* NTE - Not-to-Exceed</p>
</div>
</div></div></div>
<span property="dc:title" content="Construction Contracts FY2019"></span>
Construction Contracts FY2019
FY2020 Construction Contracts Awarded
FY2019: Construction Contracts awarded for a total value of
FY2018 Construction Contracts Awarded
FY2017 Construction Contracts Awarded
FY2016 Construction Contracts Awarded
FY2015 Construction Contracts Awarded
FY2014 Construction Contracts Awarded
FY2013 Construction Contracts Awarded
The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.
To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000.
To view a contract, click on the Contract Number for the desired project.
Contract Number
Contract Name
Award Date
Award Amount
Contractor
No. of Bidders
Contact
K-19-1806-DBB-3
AC Water & Sewer Group 1013
06/27/2019
$13,321,934.12
TC Construction Company, Inc.
7
Taylor Cox
K-19-1834-DBB-3
AC Water Group 1030
06/27/2019
$5,797,207.70
KTA Construction, Inc.
6
Juan E. Espindola
K-19-1737-DBB-3
AC Water and Sewer Group 1042
06/21/2019
$8,190,400.00
S.C. Valley Engineering, Inc.
5
Taylor Cox
K-19-1805-DBB-3
AC Water & Sewer Group 1027
06/19/2019
$5,772,761.00
Burtech Pipeline Incorporated
8
Taylor Cox
K-19-1823-DBB-3
Mission Cliff Dr Water & Sewer Main Replacement
06/10/2019
$1,757,519.00
Piperin Corporation
8
Celina Suarez
K-19-1799-DBB-3
Pipeline Rehabilitation AW-1
06/04/2019
$3,252,622.20
Burtech Pipeline
3
Ron McMinn
K-19-1787-DBB-3
Sewer and AC Water Group 797
06/04/2019
$3,701,229.80
El Cajon Grading & Engineering Co, Inc.
4
Taylor Cox
K-19-1795-DBB-3
Carmel Creek Neighborhood Park Improvements
06/03/2019
$1,023,849.51
Atlas Development
9
Ron McMinn
K-19-1796-DBB-3
Slurry Seal Group 1923
05/30/2019
$2,668,208.87
American Asphalt South, Inc.
3
Taylor Cox
K-19-1767-DBB-3
EB Scripps Park Comfort Station
05/22/2019
$3,217,646.12
Atlas Development Corporation
8
Brittany Friedenreich
K-19-1802-DBB-3
MBC Cooling Water System Chiller Upgrade
05/23/2019
$2,915,726.83
TechCom International, Corp.
9
Antoinette Sanfilippo
K-19-1794-DBB-3
Pipeline Rehabilitation AL-1
05/21/2019
$3,034,166.00
Southwest Pipeline and Trenchless Corp.
3
Juan E. Espindola
K-19-1820-EMR-3
Cardinal Dr. Storm Drain Replacement
05/20/2019
$1,000,000.00
Flat Iron West, Inc.
N/A
Ron McMinn
K-19-1827-EMR-3
Emergency Construction Services For: Civic Theater Water Line
05/16/2019
$1,200,000.00
TC Construction Company, Inc.
N/A
Celina Suarez
K-19-1804-DBB-3
Sewer & AC Water Group 807
05/10/2019
$10,447,975.59
Burtech Pipeline Inc.
3
Ron McMinn
K-19-1793-DBB-3
Richmond Street Sidewalk Improvements Project & Uptown Lining CMP Storm Drain
05/08/2019
$491,468.00
Crest Equipment, Inc.
5
Ron McMinn
K-19-1831-EMR-1
3030 32nd St. Storm Drain
05/06/2019
$150,000.00
Burtech Pipeline, Inc.
1
Antoinette Sanfilippo
L-19-1782-DBB-3
ADA SW La Jolla Shores & Calle Corta
05/02/2019
$236,530.00
Blue Pacific Engineering & Construction
4
Antoinette Sanfilippo
K-19-1790-DBB-3
Sewer Group Job 830
05/02/2019
$567,768.40
Piperin Corporation
3
Juan E. Espindola
K-19-1724-DBB-3
North City Water Reclamation Plant Expansion – Early Site Work and Ozone/BAC Relocation
04/23/2019
$16,403,300.00
AECOM Energy & Construction, Inc.
2
Juan E. Espindola
K-19-1822-EMR-3
Florida Dr. Storm Drain Replacement
04/23/2019
$1,300,000.00
Hazard Construction Company
1
Antoinette Sanfilippo
K-19-1830-EMR-3
Wellborn Street Storm Drain
04/10/2019
$500,000.00
TC Construction, Inc.
1
Antoinette Sanfilippo
K-19-1781-DBB-3
Water and Sewer Group 967
04/09/2019
$813,469.00
Burtech Pipeline Inc.
4
Brittany Friedenreich
K-19-1828-EMR-2
South Woodman Storm Drain Emergency
04/09/2019
$500,000.00
Cass Construction dba Cass Arrieta
N/A
Celina Suarez
K-19-1819-EMR-3
1925 Burroughs Storm Drain Replacement
03/19/2019
$500,000.00
Granite Construction Company
1
Taylor Cox
K-19-1816-SLS-1
Sole Source Construction Services for Repair Services for Alpha Project Homeless Shelter
02/19/2019
$105,852.29
Bill Thorpe Heating & Air
N/A
Brittany Friedenreich
K-19-1766-DBB-3
Pipeline Rehabilitation AU-1
02/13/2019
$3,326,618.10
Southwest Pipeline and Trenchless Corp.
5
Ron McMinn
K-19-1757-DBB-3
Sewer and AC Water Group 697A
02/08/2019
$4,910,682.06
Burtech Pipeline
6
Juan E. Espindola
K-19-1780-DBB-3
Miramar Landfill Storm Water Conveyance Improvements
02/01/2019
$2,030,405.06
Dick Miller Inc.
4
Ron McMinn
L-19-1771-DBB-2
Dulzura Conduit Repairs
01/30/2019
$328,500.00
New Century Construction Inc.
5
Brittany Friedenreich
K-19-1777-DB1-2
Furnish and Install New Laboratory Trailer at Pump Station 1
01/30/2019
$294,465.00
Martin Resnik Construction Co.
2
Brittany Friedenreich
K-19-1727-DBB-3
Curb Ramp Installation and Resurfacing
01/30/2019
$4,035,095.14
Superior Ready Mix Concrete, L.P.
4
Antoinette Sanfilippo
K-19-1785-DBB-3
Chollas Community Park Comfort Station
01/29/2019
$2,267,803.00
Marcon Engineering, Inc.
5
Antoinette Sanfilippo
K-19-1784-DBB-3
Mira Mesa Trunk Sewer Improvement
01/28/2019
$6,173,717.00
Orion Construction Corporation
4
Taylor Cox
K-19-1762-DBB-3-A
Bay Terraces Senior Center
01/23/2019
$3,990,606.00
Fordyce Construction, Inc.
6
Brittany Friedenreich
K-19-1560-DBB-3
California Tower Seismic Retrofit
1/22/2019
$4,710,500.00
SOLPAC Construction, Inc.
4
Ron McMinn
K-19-1772-JOC-3
JOC S18 Sitework
01/22/2019
$5,000,000.00
Ramona Paving & Construction Corp.
4
Brittany Friedenreich
K-19-1814-SLS-1
Sole-Source Construction Services for Repair Services for Alpha Project Homeless Shelter
01/22/2019
$40,000.00
Tiffany Structures Inc.
N/A
Brittany Friedenreich
L-19-1774-JOC-2
Job Order Contract (JOC) SLBE SS18 Sitework
01/15/2019
$500,000.00
Moshiri Enterprises, dba Delta Builders
4
Juan E. Espindola
K-19-1773-EMR-3
Ladera St Beach Access Stairway Coastal Bluff Stabilization
01/09/2019
$1,500,000.00
Orion Construction Corporation
N/A
Ron McMinn
K-19-1763-DBB-3
Otay Water Treatment Plant Basin No. 1 Concrete Restoration
01/04/2019
$1,170,625.00
Blue Pacific Engineering & Construction
6
Antoinette Sanfilippo
K-19-1503A-DBB-2
Camino Del Este Path Crossing Improvements
01/02/2019
$360,000.00
HMS Construction Corporation
4
Ron McMinn
K-19-1770-DBB-3
Slurry Seal Group 1902
12/21/2018
$2,348,232.04
American Asphalt South, Inc.
2
Juan E. Espindola
K-19-1775-DBB-3
Pipeline Rehabilitation AP-1
12/13/2018
$2,027,181.79
Southwest Pipeline and Trenchless Corp.
3
Juan E. Espindola
K-18-1691-DBB-3
Block 7G2 UUP
11/6/2018
$8,176,735.68
Southern Contracting Company
4
Juan E. Espindola
K-17-1518-MAC-3
Multiple Award Design-Build Contracts (MACC) for Water, Wastewater, Stormwater Pipeline Projects
10/31/2018
Burtech Pipeline Inc.; KTA Construction, Inc.; Orion Construction Corporation; Shimmick Construction Company, Inc.; TC Construction Company, Inc.
6
Brittany Friedenreich
K-18-1750-JOC-3
M17 Mechanical Systems
10/26/2018
$4,500,000.00
DuWright Construction, Inc.
2
Antoinette Sanfilippo
K-19-1768-SLS-1
Wetland Restoration and Biological Monitoring Services for Famosa
10/23/2018
$170,000.00
Dudek
1
Antoinette Sanfilippo
K-19-1719-DBB-3
Pipeline Rehabilitation AO-1
10/22/2018
$3,074,886.10
Burtech Pipeline Incorporated
2
Angelica Gil
K-18-1555-DBB-3-A
Van Dyke Storm Drain Replacement
10/19/2018
$979,077.65
Cass Construction Inc.
10
Angelica Gil
K-19-1764-DBB-3
DMP 1 & 2 Cycle Track Interim Implementation
10/19/2018
$2,011,719.53
Blue Pacific Engineering & Construction
1
Angelica Gil
K-18-1747-DBB-3
Balboa Avenue Corridor Improvements
10/8/2018
$1,394,999.41
Dick Miller, Inc.
6
Antoinette Sanfilippo
K-18-1760-JOC-3
Job Order Contract (JOC) E17 Electrical Systems
10/8/2018
$4,500,000.00
Global Power Group, Inc.
3
Juan E. Espindola
K-18-1755-DBB-3
Slurry Seal Group 1901
10/4/2018
$3,231,436.61
American Asphalt South, Inc.
3
Juan E. Espindola
L-18-1733-JOC-2
SLBE TS18 Street Lighting/Traffic Signals
10/4/2018
$500,000.00
Southwest Traffic Signal Service, Inc.
4
Juan E. Espindola
K-18-1711-DBB-3
Skyline Hills Community Park ADA Upgrades
9/14/2018
$1,674,620.00
Fordyce Construction Inc.
6
Brittany Friedenreich
K-18-1761-DBB-3
Sidewalk Replacement Group 1603
9/11/2018
$881,231.00
LC Paving and Sealing, Inc.
3
Ron McMinn
K-18-1543-JOC-3
SP17 Street Paving for Capital Improvements Projects Only (NORTH Of I-8)
9/6/2018
$10,000,000.00
TC Construction Company, Inc.
4
Angelica Gil
K-18-1543-JOC-3
SP17 Street Paving for Capital Improvements Projects Only (SOUTH Of I-8)
9/6/2018
$10,000,000.00
SRM Contracting & Paving
4
Angelica Gil
K-18-1732-DBB-3
Fire Rescue Air Operations Facility
8/24/2018
$3,214,544.00
EC Constructors
4
Brittany Friedenreich
K-18-1586-DBB-3-A
101 Ash Street Tenant Improvements
8/21/2018
$17,080,261.00
West Coast General Corporation
3
Angelica Gil
K-18-1707-DBB-3
Miramar Landfill Gas Recovery Improvements
8/10/2018
$8,218,374.00
NEO San Diego LLC & Aptim Environmental & Infrastructure, Inc.
1
Brittany Friedenreich
K-18-1696-DBB-3
Concrete Street Panel Group 1601
8/10/2018
$2,535,450.00
Portillo Concrete, Inc.
5
Juan E. Espindola
K-18-1740-DBB-3
Rolling Hills Neighborhood Park ADA Upgrade
8/8/2018
$1,537,650.00
JMJ Construction
8
Juan E. Espindola
K-18-6888-JOC-3-A
Work In Private Property For Utilities Underground
8/1/2018
$15,000,000.00
Ramona Paving & Construction Corp.
3
Angelica Gil
K-18-1697-DBB-3
Rancho Mission Canyon Park ADA Upgrades
7/24/2018
$1,650,868.00
R.E. Schultz Construction, Inc.
8
Angelica Gil
K-18-1746-DBB-3
Palm Avenue Transitional Housing
7/18/2018
$5,397,073.00
West Coast General Corporation
3
Antoinette Sanfilippo
* NTE – Not-to-Exceed
Continue Reading
More Stories
Harris applauds Nevada abortion rights effort at Reno forum – The San Diego Union-Tribune
Alleged Shoplifter May Have Shot Bear Spray at Vons Shoppers in University City – NBC San Diego
Lawsuit against Fox for false election claims heads to trial – The San Diego Union-Tribune