Forecast of Projects to be Awarded in Fiscal Year 2019 (Third Quarter Update) as of 4/1/2019
IBiz Newswire
September 10, 2019 9 min read
<div><div><div property="content:encoded">
<p><strong>(Third Quarter Update)</strong></p>
<p>Data Date: April 1, 2019</p>
<p>To create the print version set the font-size:0.5em on both tables. Save as PDF in Chrome; More Settings - Margins:None and Scale:85</p>
<p>This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City's <a href="https://www.sandiego.gov/fm/annual" target="_blank" rel="noopener noreferrer">Adopted CIP budget</a>. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects were <a href="https://www.sandiego.gov/cip/reports/constructioncontracts" target="_blank" rel="noopener noreferrer">already awarded</a> to a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. See <a href="https://www.sandiego.gov/cip/bidopps/cct" target="_blank" rel="noopener noreferrer">Construction Contract Types</a> for more information about delivery methods. Also, visit <a href="https://www.sandiego.gov/cip/bidopps" target="_blank" rel="noopener noreferrer">Bid and Contract Opportunities</a> for projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or email <a href="mailto:engineering@sandiego.gov">engineering@sandiego.gov</a>.</p>
<p><span><a href="https://www.sandiego.gov/sites/default/files/forecast_of_projects_to_be_awarded_in_fy19q3_0.pdf" type="application/pdf; length=91342"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> PRINT - Forecast of Projects to be Awarded in Fiscal Year 2019 (Third Quarter Update) as of 4/1/2019</a></span></p>
<p><img alt="File" title="application/vnd.openxmlformats-officedocument.spreadsheetml.sheet" src="https://www.sandiego.gov/modules/file/icons/x-office-spreadsheet.png"> <a href="https://www.sandiego.gov/sites/default/files/fy19q3.xlsx" type="application/vnd.openxmlformats-officedocument.spreadsheetml.sheet; length=151016">DOWNLOAD - Forecast of Projects to be Awarded (Third Quarter Update) as of 4/1/2019</a></p>
<p><span>A </span><a href="https://www.sandiego.gov/#summary">summary by asset-managing departments</a><span> is listed at the bottom of this page.</span></p>
<p><strong><span>*</span> To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.</strong></p>
<div>
<table>
<thead>
<tr>
<th><strong>Line <br> Number </strong></th>
<th><strong>Project <br> Name </strong></th>
<th><strong>Project <br> Number </strong></th>
<th><strong>Asset Managing <br> Department </strong></th>
<th><strong>Contract <br> Type </strong></th>
<th><strong>Estimated <br> Contract <br> Cost ($) </strong></th>
<th><strong>Estimated <br> Total Project <br> Cost ($) </strong></th>
<th><strong>Fiscal Year <br> Advertising </strong></th>
<th><strong>Quarter <br> Advertising </strong></th>
<th><strong>Fiscal Year <br> Awarding </strong></th>
<th><strong>Quarter <br> Awarding </strong></th>
</tr>
</thead>
<tbody>
<tr>
<td align="center">1</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16101" target="_blank" rel="noopener noreferrer">ADA S/W La Jolla Shore & Calle Corta</a></td>
<td>B16101</td>
<td>ADA Compliance and Accessibility Department</td>
<td>Design Bid Build</td>
<td align="right">$255,150</td>
<td align="right">$661,800</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">2</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15223" target="_blank" rel="noopener noreferrer">William Heath Davis House ADA Accessibil</a></td>
<td>B15223</td>
<td>ADA Compliance and Accessibility Department</td>
<td>Job Order Contract</td>
<td align="right">$202,994</td>
<td align="right">$528,200</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">3</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15230" target="_blank" rel="noopener noreferrer">ADA Accessibility Improvements Group IV</a></td>
<td>B15230</td>
<td>ADA Compliance and Accessibility Department</td>
<td>Job Order Contract</td>
<td align="right">$371,040</td>
<td align="right">$710,879</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">4</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B14153" target="_blank" rel="noopener noreferrer">Carmel Creek Park Comft St ADA Access Im</a></td>
<td>B14153</td>
<td>ADA Compliance and Accessibility Department</td>
<td>Job Order Contract</td>
<td align="right">$246,947</td>
<td align="right">$454,000</td>
<td>2017</td>
<td>Q2</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">5</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B13108" target="_blank" rel="noopener noreferrer">Group Job 13F Linda Vista DIF CR</a></td>
<td>B13108</td>
<td>ADA Compliance and Accessibility Department</td>
<td>Design Bid Build</td>
<td align="right">$166,921</td>
<td align="right">$504,429</td>
<td>2018</td>
<td>Q3</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">6</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=21003798" target="_blank" rel="noopener noreferrer">Brown Field CBP Modular Structure</a></td>
<td>21003798</td>
<td>Airports Department</td>
<td>Sole Source</td>
<td align="right">$1,884,200</td>
<td align="right">$2,939,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">7</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S12004" target="_blank" rel="noopener noreferrer">Canyonside Community Park Improvements</a></td>
<td>S12004</td>
<td>Development Services Department</td>
<td>Design Bid Build</td>
<td align="right">$1,023,833</td>
<td align="right">$1,501,126</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">8</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B13187" target="_blank" rel="noopener noreferrer">Fire Station 3 Improvements</a></td>
<td>B13187</td>
<td>Fire-Rescue Department</td>
<td>Design Bid Build</td>
<td align="right">$907,200</td>
<td align="right">$1,617,197</td>
<td>2018</td>
<td>Q2</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">9</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S10029" target="_blank" rel="noopener noreferrer">Fire Station #8 Mission Hills</a></td>
<td>S10029</td>
<td>Fire-Rescue Department</td>
<td>Design Bid Build</td>
<td align="right">$24,200</td>
<td align="right">$1,325,000</td>
<td>2018</td>
<td>Q2</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">10</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15012" target="_blank" rel="noopener noreferrer">Fire-Rescue Air Operations Facility</a></td>
<td>S15012</td>
<td>Fire-Rescue Department</td>
<td>Design Bid Build</td>
<td align="right">$3,214,544</td>
<td align="right">$4,923,601</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">11</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15011" target="_blank" rel="noopener noreferrer">Tierrasanta Library Expansion</a></td>
<td>S15011</td>
<td>Library Department</td>
<td>Job Order Contract</td>
<td align="right">$800,000</td>
<td align="right">$1,619,000</td>
<td>2018</td>
<td>Q3</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">12</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16048" target="_blank" rel="noopener noreferrer">Villa Monserate Neigh Park Upgrade</a></td>
<td>S16048</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$1,062,580</td>
<td align="right">$1,695,462</td>
<td>2019</td>
<td>Q4</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">13</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17181" target="_blank" rel="noopener noreferrer">Casa de Balboa Fire Alarm System</a></td>
<td>B17181</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$850,000</td>
<td align="right">$1,588,000</td>
<td>2019</td>
<td>Q4</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">14</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16037" target="_blank" rel="noopener noreferrer">Carmel Creek NP Improvements</a></td>
<td>S16037</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$1,057,042</td>
<td align="right">$1,706,924</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">15</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15037" target="_blank" rel="noopener noreferrer">Doyle Community Park ADA Upgrades</a></td>
<td>S15037</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$297,145</td>
<td align="right">$695,402</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">16</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15035" target="_blank" rel="noopener noreferrer">EB Scripps Park Comfort Stn Replacement</a></td>
<td>S15035</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$3,168,000</td>
<td align="right">$5,217,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">17</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=L12003.2" target="_blank" rel="noopener noreferrer">California Tower Seismic Retrofit</a></td>
<td>L12003.2</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$4,753,500</td>
<td align="right">$5,748,550</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">18</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=L17002.1" target="_blank" rel="noopener noreferrer">Balboa Park Plaza De Panama Project</a></td>
<td>L17002.1</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$60,038,145</td>
<td align="right">$78,108,614</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">19</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16058" target="_blank" rel="noopener noreferrer">Chollas Community Park Comfort Station</a></td>
<td>S16058</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$2,267,803</td>
<td align="right">$3,586,838</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">20</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16060" target="_blank" rel="noopener noreferrer">Bay Terrace Senior Center</a></td>
<td>S16060</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$3,484,865</td>
<td align="right">$6,383,376</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">21</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19009" target="_blank" rel="noopener noreferrer">Ladera St Beach Access Stairway Emg Prj</a></td>
<td>B19009</td>
<td>Parks & Recreation Department</td>
<td>Emergency</td>
<td align="right">$101,037</td>
<td align="right">$150,000</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">22</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18110" target="_blank" rel="noopener noreferrer">Chimney Canyon Slope Restoration</a></td>
<td>B18110</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$523,549</td>
<td align="right">$638,582</td>
<td>2018</td>
<td>Q2</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">23</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15038" target="_blank" rel="noopener noreferrer">Skyline Hills Community Park ADA Improve</a></td>
<td>S15038</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$1,674,620</td>
<td align="right">$2,859,854</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">24</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17036" target="_blank" rel="noopener noreferrer">Thompson Med Library/Eddy Auditor Rehab</a></td>
<td>B17036</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$2,376,360</td>
<td align="right">$3,356,360</td>
<td>2018</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">25</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15021" target="_blank" rel="noopener noreferrer">Rolling Hills Neighborhood Park ADA Upgr</a></td>
<td>S15021</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$1,537,650</td>
<td align="right">$2,028,182</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">26</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=RD16005" target="_blank" rel="noopener noreferrer">Centrum Neighborhood Park Enhancements</a></td>
<td>RD16005</td>
<td>Parks & Recreation Department</td>
<td>Agency/Developer/Managed Built - City Paid</td>
<td align="right">$937,500</td>
<td align="right">$1,000,000</td>
<td>2018</td>
<td>Q2</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">27</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B14073" target="_blank" rel="noopener noreferrer">Orchard Av, Capri by Sea & Old Salt Pool</a></td>
<td>B14073</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$333,057</td>
<td align="right">$767,883</td>
<td>2018</td>
<td>Q2</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">28</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S18004" target="_blank" rel="noopener noreferrer">Tierrasanta Sports Field Lighting Ph II</a></td>
<td>S18004</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$128,031</td>
<td align="right">$209,855</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">29</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S15004" target="_blank" rel="noopener noreferrer">Rancho Mission Neigh Pk Play Area Upgrad</a></td>
<td>S15004</td>
<td>Parks & Recreation Department</td>
<td>Design Bid Build</td>
<td align="right">$1,650,868</td>
<td align="right">$2,324,695</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">30</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16016" target="_blank" rel="noopener noreferrer">Kelly St Neighborhood Pk Security Lighting Upgrade</a></td>
<td>S16016</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$109,975</td>
<td align="right">$190,000</td>
<td>2018</td>
<td>Q1</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">31</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16018" target="_blank" rel="noopener noreferrer">Marie Widman Memorial Pk Sec Lighting</a></td>
<td>S16018</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$297,752</td>
<td align="right">$475,000</td>
<td>2018</td>
<td>Q1</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">32</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S16021" target="_blank" rel="noopener noreferrer">Skyline Hills Community Pk Security Lighting Upgrade</a></td>
<td>S16021</td>
<td>Parks & Recreation Department</td>
<td>Job Order Contract</td>
<td align="right">$103,445</td>
<td align="right">$220,000</td>
<td>2018</td>
<td>Q1</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">67</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19061" target="_blank" rel="noopener noreferrer">Balboa Park Golf Course- Parking Lot Repaving</a></td>
<td>B19061</td>
<td>Parks & Recreation Department</td>
<td>Emergency</td>
<td align="right">$730,000</td>
<td align="right">$730,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">33</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S00636" target="_blank" rel="noopener noreferrer">Dennery Ranch Neighborhood Park</a></td>
<td>S00636</td>
<td>Planning Department</td>
<td>Agency/Developer/Managed Built - City Paid</td>
<td align="right">$5,070,000</td>
<td align="right">$15,100,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">34</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B11019" target="_blank" rel="noopener noreferrer">SEWER GROUP JOB 830</a></td>
<td>B11019</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$567,768</td>
<td align="right">$604,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">35</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16129" target="_blank" rel="noopener noreferrer">Sewer & AC Water Group 797 (W)</a></td>
<td>B16129</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$2,876,121</td>
<td align="right">$3,507,785</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">36</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16145" target="_blank" rel="noopener noreferrer">Sewer & AC Water Crown Point West (S)</a></td>
<td>B16145</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$6,663,931</td>
<td align="right">$10,249,622</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">37</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16144" target="_blank" rel="noopener noreferrer">Sewer & AC Water Crown Point West (W)</a></td>
<td>B16144</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$5,312,067</td>
<td align="right">$7,301,814</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">38</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15145" target="_blank" rel="noopener noreferrer">Water and Sewer Group 967 (S)</a></td>
<td>B15145</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$547,355</td>
<td align="right">$416,113</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">39</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15147" target="_blank" rel="noopener noreferrer">AC Water & Sewer Group 1013 (S)</a></td>
<td>B15147</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$3,130,000</td>
<td align="right">$3,439,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">40</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15156" target="_blank" rel="noopener noreferrer">AC Water & Sewer Group 1013 (W)</a></td>
<td>B15156</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$10,470,000</td>
<td align="right">$12,877,154</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">41</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S11026" target="_blank" rel="noopener noreferrer">Montezuma PPL/Mid City Pipeline Ph 2</a></td>
<td>S11026</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$24,143,000</td>
<td align="right">$31,555,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">42</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18235" target="_blank" rel="noopener noreferrer">Hotel Circle CI & AC Accelerated Replacement</a></td>
<td>B18235</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$1,200,000</td>
<td align="right">$1,620,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">43</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17091" target="_blank" rel="noopener noreferrer">Remaining Small Diameter CI Water Ph 3</a></td>
<td>B17091</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$1,800,000</td>
<td align="right">$2,665,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">44</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17176" target="_blank" rel="noopener noreferrer">AC Water & Sewer Group 1042 (S)</a></td>
<td>B17176</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$298,391</td>
<td align="right">$617,400</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">45</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17177" target="_blank" rel="noopener noreferrer">AC Water & Sewer Group 1042 (W)</a></td>
<td>B17177</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$7,418,293</td>
<td align="right">$9,510,231</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">46</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B00403" target="_blank" rel="noopener noreferrer">Sewer & AC Water Group 807 (S)</a></td>
<td>B00403</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$6,009,765</td>
<td align="right">$7,873,154</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">47</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16087" target="_blank" rel="noopener noreferrer">Sewer & AC Water Group 807 (W)</a></td>
<td>B16087</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$4,248,098</td>
<td align="right">$5,762,746</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">48</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S12016" target="_blank" rel="noopener noreferrer">Otay 1st/2nd PPL West of Highland Avenue</a></td>
<td>S12016</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$21,080,400</td>
<td align="right">$29,440,500</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">49</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B12058" target="_blank" rel="noopener noreferrer">Water Group 967</a></td>
<td>B12058</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$266,114</td>
<td align="right">$1,044,266</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">50</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16001" target="_blank" rel="noopener noreferrer">Pipeline Rehabilitation AL-1</a></td>
<td>B16001</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$5,865,000</td>
<td align="right">$7,156,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">51</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18037" target="_blank" rel="noopener noreferrer">Pipeline Rehabilitation AU-1</a></td>
<td>B18037</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$3,346,618</td>
<td align="right">$4,729,165</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">52</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16104" target="_blank" rel="noopener noreferrer">Sewer Pump Station 33 Demolition</a></td>
<td>B16104</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$313,000</td>
<td align="right">$475,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">53</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15207" target="_blank" rel="noopener noreferrer">Sewer & AC Water Group 697A (W)</a></td>
<td>B15207</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$1,273,682</td>
<td align="right">$1,899,111</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">54</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B00346" target="_blank" rel="noopener noreferrer">Sewer & AC Water Group 697A (S)</a></td>
<td>B00346</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$3,858,141</td>
<td align="right">$5,253,657</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">55</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18086" target="_blank" rel="noopener noreferrer">South Bay Wtr Recl Plant Manhole Rehab</a></td>
<td>B18086</td>
<td>Public Utilities Department</td>
<td>Job Order Contract</td>
<td align="right">$179,405</td>
<td align="right">$400,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">56</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18146" target="_blank" rel="noopener noreferrer">AC Water & Sewer Group 1024A (S)</a></td>
<td>B18146</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$24,027</td>
<td align="right">$58,827</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">57</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18154" target="_blank" rel="noopener noreferrer">AC Water & Sewer Group 1024A (W)</a></td>
<td>B18154</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$176,200</td>
<td align="right">$431,400</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">58</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16056" target="_blank" rel="noopener noreferrer">Mira Mesa Trunk Sewer Improvement</a></td>
<td>B16056</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$6,173,717</td>
<td align="right">$7,908,378</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">59</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17092" target="_blank" rel="noopener noreferrer">Otay WTP-Basin #1 Concrete Restoration</a></td>
<td>B17092</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$1,938,355</td>
<td align="right">$2,650,000</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">60</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17064" target="_blank" rel="noopener noreferrer">Pipeline Rehabilitation AP-1</a></td>
<td>B17064</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$2,027,182</td>
<td align="right">$3,118,420</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">61</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17187" target="_blank" rel="noopener noreferrer">Pipeline Rehabilitation AT-1</a></td>
<td>B17187</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$5,341,000</td>
<td align="right">$6,520,000</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">62</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16161" target="_blank" rel="noopener noreferrer">Pipeline Rehabilitation AO-1</a></td>
<td>B16161</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$3,074,886</td>
<td align="right">$4,972,525</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">63</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17184" target="_blank" rel="noopener noreferrer">Pipeline Rehabilitation AS-1</a></td>
<td>B17184</td>
<td>Public Utilities Department</td>
<td>Job Order Contract</td>
<td align="right">$4,585,082</td>
<td align="right">$5,394,457</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">71</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15139" target="_blank" rel="noopener noreferrer">North City Pure Water Facility (Pkg. 1)</a></td>
<td>B15139</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$2,695,000</td>
<td align="right">$2,695,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">72</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15142" target="_blank" rel="noopener noreferrer">NCWRP Expansion (Pkg. 4)</a></td>
<td>B15142</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$13,038,300</td>
<td align="right">$15,689,300</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">79</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17006" target="_blank" rel="noopener noreferrer">NC-MBC Improvements</a></td>
<td>B17006</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$30,701,000</td>
<td align="right">$40,687,165</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">80</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16140" target="_blank" rel="noopener noreferrer">NCPWF Influent Pump Station and Pipeline</a></td>
<td>B16140</td>
<td>Public Utilities Department</td>
<td>Design Bid Build</td>
<td align="right">$29,218,851</td>
<td align="right">$38,413,734</td>
<td>2018</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">64</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S17009" target="_blank" rel="noopener noreferrer">101 Ash Improvements</a></td>
<td>S17009</td>
<td>Real Estate Assets Department</td>
<td>Design Bid Build</td>
<td align="right">$17,080,261</td>
<td align="right">$25,880,408</td>
<td>2018</td>
<td>Q3</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">65</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S18003" target="_blank" rel="noopener noreferrer">Palm Avenue Transitional Housing</a></td>
<td>S18003</td>
<td>Real Estate Assets Department</td>
<td>Design Bid Build</td>
<td align="right">$5,397,073</td>
<td align="right">$6,500,000</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">68</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19108" target="_blank" rel="noopener noreferrer">Civic Theater Water Highline</a></td>
<td>B19108</td>
<td>Real Estate Assets Department</td>
<td>Emergency</td>
<td align="right">$1,200,000</td>
<td align="right">$1,500,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">78</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19128" target="_blank" rel="noopener noreferrer">SDCCU Stadium ATS</a></td>
<td>B19128</td>
<td>Real Estate Assets Department</td>
<td>Emergency</td>
<td align="right">$5,979</td>
<td align="right">$13,979</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">66</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19102" target="_blank" rel="noopener noreferrer">S Woodman SD Replacement</a></td>
<td>B19102</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$500,000</td>
<td align="right">$750,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">69</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19126" target="_blank" rel="noopener noreferrer">6500 Montezuma Rd SD Emergency</a></td>
<td>B19126</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$1,000,000</td>
<td align="right">$1,400,000</td>
<td>N/A</td>
<td>N/A</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">70</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19127" target="_blank" rel="noopener noreferrer">7980 Park Village Rd SD Emergency</a></td>
<td>B19127</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$1,000,000</td>
<td align="right">$1,400,000</td>
<td>N/A</td>
<td>N/A</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">73</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19115" target="_blank" rel="noopener noreferrer">Florida Dr SD Replacement</a></td>
<td>B19115</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$1,300,000</td>
<td align="right">$1,700,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">74</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19112" target="_blank" rel="noopener noreferrer">3030 32nd St SD Repair</a></td>
<td>B19112</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$150,000</td>
<td align="right">$200,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">75</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19101" target="_blank" rel="noopener noreferrer">Wellborn SD Replacement</a></td>
<td>B19101</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$500,000</td>
<td align="right">$750,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">76</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19098" target="_blank" rel="noopener noreferrer">Burroughs SD Replacement</a></td>
<td>B19098</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$400,000</td>
<td align="right">$750,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">77</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B19090" target="_blank" rel="noopener noreferrer">Cardinal Drive SD Replacement</a></td>
<td>B19090</td>
<td>Transportation & Storm Water Department</td>
<td>Emergency</td>
<td align="right">$1,000,000</td>
<td align="right">$1,250,000</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">81</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B13143" target="_blank" rel="noopener noreferrer">31st Street UUD (Market St - L St)</a></td>
<td>B13143</td>
<td>Transportation & Storm Water Department</td>
<td>Job Order Contract</td>
<td align="right">$14,000</td>
<td align="right">$18,000</td>
<td>2019</td>
<td>Q4</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">82</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16030" target="_blank" rel="noopener noreferrer">Sidewalk Replacement Group 1604</a></td>
<td>B16030</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$1,010,000</td>
<td align="right">$1,418,000</td>
<td>2019</td>
<td>Q4</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">83</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17095" target="_blank" rel="noopener noreferrer">Asphalt Resurfacing Group 1702 (Option C</a></td>
<td>B17095</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$4,756,087</td>
<td align="right">$5,500,000</td>
<td>2019</td>
<td>Q4</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">84</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S00969" target="_blank" rel="noopener noreferrer">Carmel Country Road Low Flow Channel</a></td>
<td>S00969</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$1,681,500</td>
<td align="right">$2,712,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">85</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17079" target="_blank" rel="noopener noreferrer">Manzana Storm Drain Replacement</a></td>
<td>B17079</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$853,000</td>
<td align="right">$1,250,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">86</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15026" target="_blank" rel="noopener noreferrer">Ash St & Richmond St Sidewalks</a></td>
<td>B15026</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$274,471</td>
<td align="right">$730,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">87</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16091" target="_blank" rel="noopener noreferrer">Uptown CMP SD Lining</a></td>
<td>B16091</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$231,997</td>
<td align="right">$584,000</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">88</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17156" target="_blank" rel="noopener noreferrer">W Bernardo @ Technology Traffic Signal</a></td>
<td>B17156</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$304,316</td>
<td align="right">$479,700</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">89</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18143" target="_blank" rel="noopener noreferrer">Block7-O1</a></td>
<td>B18143</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$290,113</td>
<td align="right">$391,653</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">90</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15009" target="_blank" rel="noopener noreferrer">Jackson Dr & Winding Creek Dr TS</a></td>
<td>B15009</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$229,875</td>
<td align="right">$321,088</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">91</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=21003599" target="_blank" rel="noopener noreferrer">Block 8R UUP</a></td>
<td>21003599</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$4,280,026</td>
<td align="right">$6,170,626</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">92</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15097" target="_blank" rel="noopener noreferrer">Block 8R UUP - CIP</a></td>
<td>B15097</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$1,257,905</td>
<td align="right">$1,597,981</td>
<td>2019</td>
<td>Q2</td>
<td>2019</td>
<td>Q4</td>
</tr>
<tr>
<td align="center">93</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S00858" target="_blank" rel="noopener noreferrer">Del Sol Boulevard-Central</a></td>
<td>S00858</td>
<td>Transportation & Storm Water Department</td>
<td>Developer Build</td>
<td align="right">$166,236</td>
<td align="right">$5,511,297</td>
<td>2012</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">94</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17068" target="_blank" rel="noopener noreferrer">Block 3HH (Talmadge 3) Rd Imp UU352</a></td>
<td>B17068</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$1,025,387</td>
<td align="right">$1,368,257</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">95</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17069" target="_blank" rel="noopener noreferrer">Cardiff St (Wade-Carlisle) Rd Imp UU10</a></td>
<td>B17069</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$66,968</td>
<td align="right">$253,560</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">96</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17070" target="_blank" rel="noopener noreferrer">28th St (Island Av-Clay St) Rd Imp UU9</a></td>
<td>B17070</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$445,776</td>
<td align="right">$445,776</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">97</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17072" target="_blank" rel="noopener noreferrer">Illion St (Gardena-Milton Rd) Imp UU624</a></td>
<td>B17072</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$131,289</td>
<td align="right">$142,444</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">98</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17073" target="_blank" rel="noopener noreferrer">Mt Alifan (Genesee-Mt Everst) Rd Imp UU21</a></td>
<td>B17073</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$170,214</td>
<td align="right">$203,373</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">99</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17074" target="_blank" rel="noopener noreferrer">Block 8A (Golden Hill) Rd Imp UU494</a></td>
<td>B17074</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$1,051,414</td>
<td align="right">$1,051,414</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">100</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17097" target="_blank" rel="noopener noreferrer">Woodrow (Calvocado-Armacost) Rd Imp UU16</a></td>
<td>B17097</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$153,146</td>
<td align="right">$196,099</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">101</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B18152" target="_blank" rel="noopener noreferrer">Block 2S1 South Mission RD IMP UU977_RP</a></td>
<td>B18152</td>
<td>Transportation & Storm Water Department</td>
<td>Job Order Contract</td>
<td align="right">$157,911</td>
<td align="right">$213,180</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">102</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B13088" target="_blank" rel="noopener noreferrer">Camino del Este Path Xing Improvements</a></td>
<td>B13088</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$360,000</td>
<td align="right">$507,098</td>
<td>2019</td>
<td>Q1</td>
<td>2019</td>
<td>Q3</td>
</tr>
<tr>
<td align="center">103</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=21003598" target="_blank" rel="noopener noreferrer">Block 7G2 UUP</a></td>
<td>21003598</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$7,679,523</td>
<td align="right">$10,367,356</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">104</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16029" target="_blank" rel="noopener noreferrer">Sidewalk Replacement Group 1603</a></td>
<td>B16029</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$881,231</td>
<td align="right">$1,200,000</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">105</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B17056" target="_blank" rel="noopener noreferrer">Downtown Complete Streets Implementation</a></td>
<td>B17056</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$2,011,720</td>
<td align="right">$31,571,100</td>
<td>2019</td>
<td>Q3</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">106</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B12034" target="_blank" rel="noopener noreferrer">Van Dyke Ave (4481) Storm Drain Replacem</a></td>
<td>B12034</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$979,078</td>
<td align="right">$1,817,918</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">107</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15095" target="_blank" rel="noopener noreferrer">Hilltop Drive UUP (Boundary to Toyne) -</a></td>
<td>B15095</td>
<td>Transportation & Storm Water Department</td>
<td>Job Order Contract</td>
<td align="right">$189,555</td>
<td align="right">$208,455</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">108</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S00831" target="_blank" rel="noopener noreferrer">Balboa Avenue Corridor Improvements</a></td>
<td>S00831</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$1,394,999</td>
<td align="right">$2,981,887</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">109</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B15085" target="_blank" rel="noopener noreferrer">Block 7G2 UUP - CIP</a></td>
<td>B15085</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$497,213</td>
<td align="right">$671,232</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q2</td>
</tr>
<tr>
<td align="center">110</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S11002" target="_blank" rel="noopener noreferrer">Hayes Ave Storm Drain</a></td>
<td>S11002</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$746,832</td>
<td align="right">$1,320,100</td>
<td>2018</td>
<td>Q3</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">111</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B16026" target="_blank" rel="noopener noreferrer">Concrete Street Panel Group 1601</a></td>
<td>B16026</td>
<td>Transportation & Storm Water Department</td>
<td>Design Bid Build</td>
<td align="right">$2,535,450</td>
<td align="right">$3,331,305</td>
<td>2018</td>
<td>Q3</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">112</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=S00886" target="_blank" rel="noopener noreferrer">Euclid Ave & Home Improvements</a></td>
<td>S00886</td>
<td>Transportation & Storm Water Department</td>
<td>Job Order Contract</td>
<td align="right">$76,676</td>
<td align="right">$1,029,415</td>
<td>2017</td>
<td>Q1</td>
<td>2019</td>
<td>Q1</td>
</tr>
<tr>
<td align="center">113</td>
<td><a href="http://cipapp.sandiego.gov/CIPDetail.aspx?ID=B13008" target="_blank" rel="noopener noreferrer">Pacific Hwy & W Palm St Signal Mod</a></td>
<td>B13008</td>
<td>Transportation & Storm Water Department</td>
<td>Job Order Contract</td>
<td align="right">$160,000</td>
<td align="right">$279,200</td>
<td>2018</td>
<td>Q4</td>
<td>2019</td>
<td>Q1</td>
</tr>
</tbody>
</table>
</div>
<h4><a name="summary"></a></h4>
<div>
<div>
<h3><strong>Summary By Asset-Managing Departments</strong></h3>
<div>
<table border="1" cellpadding="0">
<thead>
<tr>
<th><strong>Asset-Managing Department</strong></th>
<th><strong>Estimated Construction Contract Award</strong></th>
<th><strong>Estimated Total Project Cost</strong></th>
</tr>
</thead>
<tbody>
<tr>
<td>ADA Compliance and Accessibility Department</td>
<td align="right">$1,243,052</td>
<td align="right">$2,859,308</td>
</tr>
<tr>
<td>Airports Department</td>
<td align="right">$1,884,200</td>
<td align="right">$2,939,000</td>
</tr>
<tr>
<td>Development Services Department</td>
<td align="right">$1,023,833</td>
<td align="right">$1,501,126</td>
</tr>
<tr>
<td>Fire-Rescue Department</td>
<td align="right">$4,145,944</td>
<td align="right">$7,865,798</td>
</tr>
<tr>
<td>Library Department</td>
<td align="right">$800,000</td>
<td align="right">$1,619,000</td>
</tr>
<tr>
<td>Parks & Recreation Department</td>
<td align="right">$87,482,924</td>
<td align="right">$119,680,577</td>
</tr>
<tr>
<td>Planning Department</td>
<td align="right">$5,070,000</td>
<td align="right">$15,100,000</td>
</tr>
<tr>
<td>Public Utilities Department</td>
<td align="right">$209,860,749</td>
<td align="right">$276,935,924</td>
</tr>
<tr>
<td>Real Estate Assets Department</td>
<td align="right">$23,683,313</td>
<td align="right">$33,894,387</td>
</tr>
<tr>
<td>Transportation & Storm Water Department</td>
<td align="right">$41,913,909</td>
<td align="right">$94,043,513</td>
</tr>
<tr>
<td><strong>FY 2019 Total</strong></td>
<td align="right"><strong>$377,107,923</strong></td>
<td align="right"><strong>$556,438,633</strong></td>
</tr>
</tbody>
</table>
</div>
<p><strong>*</strong> Estimated Advertise and Award Dates for Pure Water projects are to be determined.</p>
</div>
<div> <div> <div> <div about="/block/forecast-of-projects-to-be-award" typeof=""> <div> <div><div><div>
<h3><strong>Archive of Anticipated CIP Projects</strong></h3>
<div>
<div>
<p><a href="https://www.sandiego.gov/#"><strong>Forecast of Projects to be Awarded in Fiscal Year 2020</strong><i></i></a></p>
<div>
<ul>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded">Forecast of Projects to be Awarded in Fiscal Year 2020 as of 7/1/2019</a></li>
</ul>
</div>
</div>
<div>
<p><a href="https://www.sandiego.gov/#"><strong>Forecast of Projects to be Awarded in Fiscal Year 2019</strong><i></i></a></p>
<div>
<ul>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2019q3">Forecast of Projects to be Awarded in Fiscal Year 2019 (Third Quarter Update) as of 4/1/2019</a></li>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2019q2">Forecast of Projects to be Awarded in Fiscal Year 2019 (Second Quarter Update) as of 2/15/2019</a></li>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2019q1">Forecast of Projects to be Awarded in Fiscal Year 2019 (First Quarter Update) as of 6/1/2018</a></li>
</ul>
</div>
</div>
<div>
<p><a href="https://www.sandiego.gov/#"><strong>Forecast of Projects to be Awarded in Fiscal Year 2018</strong><i></i></a></p>
<div>
<ul>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawardedfy18">Forecast of Projects to be Awarded in Fiscal Year 2018 as of 6/1/2018</a></li>
</ul>
</div>
</div>
<div>
<p><a href="https://www.sandiego.gov/#"><strong>Forecast of Projects to be Awarded in Fiscal Year 2017</strong><i></i></a></p>
<div>
<ul>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2017q3">Forecast of Projects to be Awarded in Fiscal Year 2017 (Third Quarter Update) as of 4/18/2017</a></li>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2017q2">Forecast of Projects to be Awarded in Fiscal Year 2017 (Second Quarter Update) as of 2/12/2017</a></li>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2017q1">Forecast of Projects to be Awarded in Fiscal Year 2017 (First Quarter Update) as of 4/1/2016</a></li>
</ul>
</div>
</div>
<div>
<p><a href="https://www.sandiego.gov/#"><strong>Forecast of Projects to be Awarded in Fiscal Year 2016</strong><i></i></a></p>
<div>
<ul>
<li><a href="https://www.sandiego.gov/cip/reports/forecastofprojectstobeawarded2016q3">Forecast of Projects to be Awarded in Fiscal Year 2016 (Third Quarter Update) as of 4/1/2016</a></li>
<li><a href="http://apps.sandiego.gov/directories/cip/reports/forecastofprojectstobeawarded.html">Forecast of Projects to be Awarded in Fiscal Year 2016 (Second Quarter Update) as of 1/1/2016 </a></li>
<li><a href="http://apps.sandiego.gov/directories/cip/reports/forecastofprojectstobeawarded161.html">Forecast of Projects to be Awarded in Fiscal Year 2016 (First Quarter Update) as of 10/1/2015</a></li>
<li><a href="http://apps.sandiego.gov/directories/cip/reports/forecastofprojectstobeawarded16.html">Forecast of Projects to be Awarded in Fiscal Year 2016 as of 07/1/2015</a></li>
</ul>
</div>
</div>
<div>
<p><a href="https://www.sandiego.gov/#"><strong>Forecast of Projects to be Awarded in Fiscal Year 2015</strong><i></i></a></p>
<div>
<ul>
<li><span><a href="https://www.sandiego.gov/cip/pdf/cipcontractsawardlist.pdf" type="application/pdf"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> Forecast of Projects to be Awarded in Fiscal Year 2015 as of 04/1/2015</a></span></li>
</ul>
</div>
</div>
</div>
</div></div></div> </div>
</div> </div> </div>
</div>
</div>
</div></div></div>
<span property="dc:title" content="Forecast of Projects to be Awarded in Fiscal Year 2019 (Third Quarter Update) as of 4/1/2019"></span>
(Third Quarter Update)
Data Date: April 1, 2019
To create the print version set the font-size:0.5em on both tables. Save as PDF in Chrome; More Settings – Margins:None and Scale:85
This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City’s Adopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects were already awarded to a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. See Construction Contract Types for more information about delivery methods. Also, visit Bid and Contract Opportunities for projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or email .
More Stories
Harris applauds Nevada abortion rights effort at Reno forum – The San Diego Union-Tribune
Alleged Shoplifter May Have Shot Bear Spray at Vons Shoppers in University City – NBC San Diego
Lawsuit against Fox for false election claims heads to trial – The San Diego Union-Tribune