Internet Business Newswire

Global Business News

Construction Contracts FY2019

<div><div><div property="content:encoded"> <div> <h2>Construction Contracts FY2019</h2> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontracts">FY2020 Construction Contracts Awarded</a></p> <p>FY2019: <span> </span> Construction Contracts awarded for a total value of <span> </span></p> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy18">FY2018 Construction Contracts Awarded</a></p> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy17">FY2017 Construction Contracts Awarded</a></p> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy16">FY2016 Construction Contracts Awarded</a></p> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy15">FY2015 Construction Contracts Awarded</a></p> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy14">FY2014 Construction Contracts Awarded</a></p> <p><a href="https://www.sandiego.gov/cip/reports/constructioncontractsfy13">FY2013 Construction Contracts Awarded</a></p> <p>The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.</p> <p>To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000.</p> <p>To view a contract, click on the Contract Number for the desired project.</p> <p> </p> <ul> <li><a href="https://www.sandiego.gov/cip/reports/consultantcontracts">View A&E and Other Contracts</a></li> <li><a href="https://www.sandiego.gov/cip/reports/minor-repair-contracts">View Minor Repair Contracts</a></li> </ul> <p> </p> <table> <thead> <tr> <th width="11%">Contract Number</th> <th>Contract Name</th> <th>Award Date</th> <th>Award Amount</th> <th>Contractor</th> <th>No. of Bidders</th> <th>Contact</th> </tr> </thead> <tbody> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1806-dbb-3.pdf" type="application/pdf; length=51190910"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1806-DBB-3</a></span></td> <td>AC Water & Sewer Group 1013</td> <td align="center">06/27/2019</td> <td align="center">$13,321,934.12</td> <td>TC Construction Company, Inc.</td> <td align="center">7</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1834-dbbb-3.pdf" type="application/pdf; length=35510644"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1834-DBB-3</a></span></td> <td>AC Water Group 1030</td> <td align="center">06/27/2019</td> <td align="center">$5,797,207.70</td> <td>KTA Construction, Inc.</td> <td align="center">6</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1737-dbb-3.pdf" type="application/pdf; length=31977173"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1737-DBB-3</a></span></td> <td>AC Water and Sewer Group 1042</td> <td align="center">06/21/2019</td> <td align="center">$8,190,400.00</td> <td>S.C. Valley Engineering, Inc.</td> <td align="center">5</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1805-dbb-3.pdf" type="application/pdf; length=26813943"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1805-DBB-3</a></span></td> <td>AC Water & Sewer Group 1027</td> <td align="center">06/19/2019</td> <td align="center">$5,772,761.00</td> <td>Burtech Pipeline Incorporated</td> <td align="center">8</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1823-dbb-3.pdf" type="application/pdf; length=9771823"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1823-DBB-3</a></span></td> <td>Mission Cliff Dr Water & Sewer Main Replacement</td> <td align="center">06/10/2019</td> <td align="center">$1,757,519.00</td> <td>Piperin Corporation</td> <td align="center">8</td> <td><a href="mailto:CSuarez@sandiego.gov">Celina Suarez</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1799-dbb-3.pdf" type="application/pdf; length=38907888"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1799-DBB-3</a></span></td> <td>Pipeline Rehabilitation AW-1</td> <td align="center">06/04/2019</td> <td align="center">$3,252,622.20</td> <td>Burtech Pipeline</td> <td align="center">3</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1787-dbb-3.pdf" type="application/pdf; length=50253699"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1787-DBB-3</a></span></td> <td>Sewer and AC Water Group 797</td> <td align="center">06/04/2019</td> <td align="center">$3,701,229.80</td> <td>El Cajon Grading & Engineering Co, Inc.</td> <td align="center">4</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1795-dbb-3.pdf" type="application/pdf; length=6485161"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1795-DBB-3</a></span></td> <td>Carmel Creek Neighborhood Park Improvements</td> <td align="center">06/03/2019</td> <td align="center">$1,023,849.51</td> <td>Atlas Development</td> <td align="center">9</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1796-dbb-3.pdf" type="application/pdf; length=19279989"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1796-DBB-3</a></span></td> <td>Slurry Seal Group 1923</td> <td align="center">05/30/2019</td> <td align="center">$2,668,208.87</td> <td>American Asphalt South, Inc.</td> <td align="center">3</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1767-dbb-3-eb.pdf" type="application/pdf; length=41878877"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1767-DBB-3</a></span></td> <td>EB Scripps Park Comfort Station</td> <td align="center">05/22/2019</td> <td align="center">$3,217,646.12</td> <td>Atlas Development Corporation</td> <td align="center">8</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1802-dbb-3.pdf" type="application/pdf; length=20878049"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1802-DBB-3</a></span></td> <td>MBC Cooling Water System Chiller Upgrade</td> <td align="center">05/23/2019</td> <td align="center">$2,915,726.83</td> <td>TechCom International, Corp.</td> <td align="center">9</td> <td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1794-dbb-3.pdf" type="application/pdf; length=27919270"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1794-DBB-3</a></span></td> <td>Pipeline Rehabilitation AL-1</td> <td align="center">05/21/2019</td> <td align="center">$3,034,166.00</td> <td>Southwest Pipeline and Trenchless Corp.</td> <td align="center">3</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1820-emr-3.pdf" type="application/pdf; length=2962232"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1820-EMR-3</a></span></td> <td>Cardinal Dr. Storm Drain Replacement</td> <td align="center">05/20/2019</td> <td align="center">$1,000,000.00</td> <td>Flat Iron West, Inc.</td> <td align="center">N/A</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1827-emr-3.pdf" type="application/pdf; length=4358300"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1827-EMR-3</a></span></td> <td>Emergency Construction Services For: Civic Theater Water Line</td> <td align="center">05/16/2019</td> <td align="center">$1,200,000.00</td> <td>TC Construction Company, Inc.</td> <td align="center">N/A</td> <td><a href="mailto:CSuarez@sandiego.gov">Celina Suarez</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1804-dbb-3.pdf" type="application/pdf; length=41788943"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1804-DBB-3</a></span></td> <td>Sewer & AC Water Group 807</td> <td align="center">05/10/2019</td> <td align="center">$10,447,975.59</td> <td>Burtech Pipeline Inc.</td> <td align="center">3</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1793-dbb-3.pdf" type="application/pdf; length=9163058"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1793-DBB-3</a></span></td> <td>Richmond Street Sidewalk Improvements Project & Uptown Lining CMP Storm Drain</td> <td align="center">05/08/2019</td> <td align="center">$491,468.00</td> <td>Crest Equipment, Inc.</td> <td align="center">5</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1831-emr-1.pdf" type="application/pdf; length=4035639"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1831-EMR-1</a></span></td> <td>3030 32nd St. Storm Drain</td> <td align="center">05/06/2019</td> <td align="center">$150,000.00</td> <td>Burtech Pipeline, Inc.</td> <td align="center">1</td> <td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/l-19-1782-dbb-3.pdf" type="application/pdf; length=23801762"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-19-1782-DBB-3</a></span></td> <td>ADA SW La Jolla Shores & Calle Corta</td> <td align="center">05/02/2019</td> <td align="center">$236,530.00</td> <td>Blue Pacific Engineering & Construction</td> <td align="center">4</td> <td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1790-dbb-3.pdf" type="application/pdf; length=9066113"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1790-DBB-3</a></span></td> <td>Sewer Group Job 830</td> <td align="center">05/02/2019</td> <td align="center">$567,768.40</td> <td>Piperin Corporation</td> <td align="center">3</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1724-dbb-3.pdf" type="application/pdf; length=70679671"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1724-DBB-3</a></span></td> <td>North City Water Reclamation Plant Expansion – Early Site Work and Ozone/BAC Relocation</td> <td align="center">04/23/2019</td> <td align="center">$16,403,300.00</td> <td>AECOM Energy & Construction, Inc.</td> <td align="center">2</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1822-emr-3.pdf" type="application/pdf; length=3867842"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1822-EMR-3</a></span></td> <td>Florida Dr. Storm Drain Replacement</td> <td align="center">04/23/2019</td> <td align="center">$1,300,000.00</td> <td>Hazard Construction Company</td> <td align="center">1</td> <td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1830-emr-3.pdf" type="application/pdf; length=5684602"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1830-EMR-3</a></span></td> <td>Wellborn Street Storm Drain</td> <td align="center">04/10/2019</td> <td align="center">$500,000.00</td> <td>TC Construction, Inc.</td> <td align="center">1</td> <td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1781-dbb-3.pdf" type="application/pdf; length=12716253"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1781-DBB-3</a></span></td> <td>Water and Sewer Group 967</td> <td align="center">04/09/2019</td> <td align="center">$813,469.00</td> <td>Burtech Pipeline Inc.</td> <td align="center">4</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1828-emr-2.pdf" type="application/pdf; length=9281959"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1828-EMR-2</a></span></td> <td>South Woodman Storm Drain Emergency</td> <td align="center">04/09/2019</td> <td align="center">$500,000.00</td> <td>Cass Construction dba Cass Arrieta</td> <td align="center">N/A</td> <td><a href="mailto:CSuarez@sandiego.gov">Celina Suarez</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1819-emr-3.pdf" type="application/pdf; length=4308775"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1819-EMR-3</a></span></td> <td>1925 Burroughs Storm Drain Replacement</td> <td align="center">03/19/2019</td> <td align="center">$500,000.00</td> <td>Granite Construction Company</td> <td align="center">1</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1816-sls-1.pdf" type="application/pdf; length=6642950"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1816-SLS-1</a></span></td> <td>Sole Source Construction Services for Repair Services for Alpha Project Homeless Shelter</td> <td align="center">02/19/2019</td> <td align="center">$105,852.29</td> <td>Bill Thorpe Heating & Air</td> <td align="center">N/A</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1766-dbb-3.pdf" type="application/pdf; length=76119540"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1766-DBB-3</a></span></td> <td>Pipeline Rehabilitation AU-1</td> <td align="center">02/13/2019</td> <td align="center">$3,326,618.10</td> <td>Southwest Pipeline and Trenchless Corp.</td> <td align="center">5</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1757-dbb-3.pdf" type="application/pdf; length=73219997"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1757-DBB-3</a></span></td> <td>Sewer and AC Water Group 697A</td> <td align="center">02/08/2019</td> <td align="center">$4,910,682.06</td> <td>Burtech Pipeline</td> <td align="center">6</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1780-dbb-3.pdf" type="application/pdf; length=23507015"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1780-DBB-3</a></span></td> <td>Miramar Landfill Storm Water Conveyance Improvements</td> <td align="center">02/01/2019</td> <td align="center">$2,030,405.06</td> <td>Dick Miller Inc.</td> <td align="center">4</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/l-19-1771-dbb-2.pdf" type="application/pdf; length=12635068"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-19-1771-DBB-2</a></span></td> <td>Dulzura Conduit Repairs</td> <td align="center">01/30/2019</td> <td align="center">$328,500.00</td> <td>New Century Construction Inc.</td> <td align="center">5</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1777-db1-2.pdf" type="application/pdf; length=13806974"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1777-DB1-2</a></span></td> <td>Furnish and Install New Laboratory Trailer at Pump Station 1</td> <td align="center">01/30/2019</td> <td align="center">$294,465.00</td> <td>Martin Resnik Construction Co.</td> <td align="center">2</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1727-dbb-3.pdf" type="application/pdf; length=35995166"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1727-DBB-3</a></span></td> <td>Curb Ramp Installation and Resurfacing</td> <td align="center">01/30/2019</td> <td align="center">$4,035,095.14</td> <td>Superior Ready Mix Concrete, L.P.</td> <td align="center">4</td> <td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1785-dbb-3.pdf" type="application/pdf; length=8940852"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1785-DBB-3</a></span></td> <td>Chollas Community Park Comfort Station</td> <td align="center">01/29/2019</td> <td align="center">$2,267,803.00</td> <td>Marcon Engineering, Inc.</td> <td align="center">5</td> <td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1784-dbb-3.pdf" type="application/pdf; length=17218532"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1784-DBB-3</a></span></td> <td>Mira Mesa Trunk Sewer Improvement</td> <td align="center">01/28/2019</td> <td align="center">$6,173,717.00</td> <td>Orion Construction Corporation</td> <td align="center">4</td> <td><a href="mailto:TJCox@sandiego.gov">Taylor Cox</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1762-dbb-3-a.pdf" type="application/pdf; length=30406765"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1762-DBB-3-A</a></span></td> <td>Bay Terraces Senior Center</td> <td align="center">01/23/2019</td> <td align="center">$3,990,606.00</td> <td>Fordyce Construction, Inc.</td> <td align="center">6</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1560-dbb-3.pdf" type="application/pdf; length=40799399"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1560-DBB-3</a></span></td> <td>California Tower Seismic Retrofit</td> <td align="center">1/22/2019</td> <td align="center">$4,710,500.00</td> <td>SOLPAC Construction, Inc.</td> <td align="center">4</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1772-joc-3.pdf" type="application/pdf; length=3348198"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1772-JOC-3</a></span></td> <td>JOC S18 Sitework</td> <td align="center">01/22/2019</td> <td align="center">$5,000,000.00</td> <td>Ramona Paving & Construction Corp.</td> <td align="center">4</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1814-sls-1.pdf" type="application/pdf; length=626867"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1814-SLS-1</a></span></td> <td>Sole-Source Construction Services for Repair Services for Alpha Project Homeless Shelter</td> <td align="center">01/22/2019</td> <td align="center">$40,000.00</td> <td>Tiffany Structures Inc.</td> <td align="center">N/A</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/l-19-1774-joc-2.pdf" type="application/pdf; length=1605950"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-19-1774-JOC-2</a></span></td> <td>Job Order Contract (JOC)  SLBE SS18 Sitework</td> <td align="center">01/15/2019</td> <td align="center">$500,000.00</td> <td>Moshiri Enterprises, dba Delta Builders</td> <td align="center">4</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1773-emr-3.pdf" type="application/pdf; length=2867401"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1773-EMR-3</a></span></td> <td>Ladera St Beach Access Stairway Coastal Bluff Stabilization</td> <td align="center">01/09/2019</td> <td align="center">$1,500,000.00</td> <td>Orion Construction Corporation</td> <td align="center">N/A</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1763-dbb-3.pdf" type="application/pdf; length=13610586"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1763-DBB-3</a></span></td> <td>Otay Water Treatment Plant Basin No. 1 Concrete Restoration</td> <td align="center">01/04/2019</td> <td align="center">$1,170,625.00</td> <td>Blue Pacific Engineering & Construction</td> <td align="center">6</td> <td><a href="mailto:ASanfilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1503-dbb-2-a.pdf" type="application/pdf; length=13607352"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1503A-DBB-2</a></span></td> <td>Camino Del  Este Path Crossing Improvements</td> <td align="center">01/02/2019</td> <td align="center">$360,000.00</td> <td>HMS Construction Corporation</td> <td align="center">4</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1770-dbb-3.pdf" type="application/pdf; length=11442094"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1770-DBB-3</a></span></td> <td>Slurry Seal Group 1902</td> <td align="center">12/21/2018</td> <td align="center">$2,348,232.04</td> <td>American Asphalt South, Inc.</td> <td align="center">2</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1775-dbb-3.pdf" type="application/pdf; length=49466575"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1775-DBB-3</a></span></td> <td>Pipeline Rehabilitation AP-1</td> <td align="center">12/13/2018</td> <td align="center">$2,027,181.79</td> <td>Southwest Pipeline and Trenchless Corp.</td> <td align="center">3</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1691-dbb-3.pdf" type="application/pdf; length=21761666"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1691-DBB-3</a></span></td> <td>Block 7G2 UUP</td> <td align="center">11/6/2018</td> <td align="center">$8,176,735.68</td> <td>Southern Contracting Company</td> <td align="center">4</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-17-1518-mac-3.pdf" type="application/pdf; length=96892108"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-17-1518-MAC-3</a></span></td> <td>Multiple Award Design-Build Contracts (MACC) for Water, Wastewater, Stormwater Pipeline Projects</td> <td align="center">10/31/2018</td> <td align="center"> </td> <td>Burtech Pipeline Inc.; KTA Construction, Inc.; Orion Construction Corporation; Shimmick Construction Company, Inc.; TC Construction Company, Inc.</td> <td align="center">6</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1750-joc-3.pdf" type="application/pdf; length=4487385"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1750-JOC-3</a></span></td> <td>M17 Mechanical Systems</td> <td align="center">10/26/2018</td> <td align="center">$4,500,000.00</td> <td>DuWright Construction, Inc.</td> <td align="center">2</td> <td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1768-sls-1.pdf" type="application/pdf; length=3393807"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1768-SLS-1</a></span></td> <td>Wetland Restoration and Biological Monitoring Services for Famosa</td> <td align="center">10/23/2018</td> <td align="center">$170,000.00</td> <td>Dudek</td> <td align="center">1</td> <td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1719-dbb-3.pdf" type="application/pdf; length=81618017"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1719-DBB-3</a></span></td> <td>Pipeline Rehabilitation AO-1</td> <td align="center">10/22/2018</td> <td align="center">$3,074,886.10</td> <td>Burtech Pipeline Incorporated</td> <td align="center">2</td> <td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1555-dbb-3-a.pdf" type="application/pdf; length=32927837"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1555-DBB-3-A</a></span></td> <td>Van Dyke Storm Drain Replacement</td> <td align="center">10/19/2018</td> <td align="center">$979,077.65</td> <td>Cass Construction Inc.</td> <td align="center">10</td> <td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-19-1764-dbb-3.pdf" type="application/pdf; length=38147749"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-19-1764-DBB-3</a></span></td> <td>DMP 1 & 2 Cycle Track Interim Implementation</td> <td align="center">10/19/2018</td> <td align="center">$2,011,719.53</td> <td>Blue Pacific Engineering & Construction</td> <td align="center">1</td> <td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1747-dbb-3.pdf" type="application/pdf; length=9605233"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1747-DBB-3</a></span></td> <td>Balboa Avenue Corridor Improvements</td> <td align="center">10/8/2018</td> <td align="center">$1,394,999.41</td> <td>Dick Miller, Inc.</td> <td align="center">6</td> <td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1760-joc-3.pdf" type="application/pdf; length=3727813"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1760-JOC-3</a></span></td> <td>Job Order Contract (JOC) E17 Electrical Systems</td> <td align="center">10/8/2018</td> <td align="center">$4,500,000.00</td> <td>Global Power Group, Inc.</td> <td align="center">3</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1755-dbb-3.pdf" type="application/pdf; length=58203362"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1755-DBB-3</a></span></td> <td>Slurry Seal Group 1901</td> <td align="center">10/4/2018</td> <td align="center">$3,231,436.61</td> <td>American Asphalt South, Inc.</td> <td align="center">3</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/l-18-1733-joc-2.pdf" type="application/pdf; length=3215800"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> L-18-1733-JOC-2</a></span></td> <td>SLBE TS18 Street Lighting/Traffic Signals</td> <td align="center">10/4/2018</td> <td align="center">$500,000.00</td> <td>Southwest Traffic Signal Service, Inc.</td> <td align="center">4</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1711-dbb-3.pdf" type="application/pdf; length=7213718"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1711-DBB-3</a></span></td> <td>Skyline Hills Community Park ADA Upgrades</td> <td align="center">9/14/2018</td> <td align="center">$1,674,620.00</td> <td>Fordyce Construction Inc.</td> <td align="center">6</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1761-dbb-3.pdf" type="application/pdf; length=35335427"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1761-DBB-3</a></span></td> <td>Sidewalk Replacement Group 1603</td> <td align="center">9/11/2018</td> <td align="center">$881,231.00</td> <td>LC Paving and Sealing, Inc.</td> <td align="center">3</td> <td><a href="mailto:RMcMinn@sandiego.gov">Ron McMinn</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1543-joc-3-north.pdf" type="application/pdf; length=5274120"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1543-JOC-3</a></span></td> <td> <p>SP17 Street Paving for Capital Improvements Projects Only <span>(NORTH Of I-8)</span></p> </td> <td align="center">9/6/2018</td> <td align="center">$10,000,000.00</td> <td>TC Construction Company, Inc.</td> <td align="center">4</td> <td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1543-joc-3-south.pdf" type="application/pdf; length=4220156"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1543-JOC-3</a></span></td> <td> <p>SP17 Street Paving for Capital Improvements Projects Only <span>(SOUTH Of I-8)</span></p> </td> <td align="center">9/6/2018</td> <td align="center">$10,000,000.00</td> <td>SRM Contracting & Paving</td> <td align="center">4</td> <td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1732-dbb-3.pdf" type="application/pdf; length=55522643"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1732-DBB-3</a></span></td> <td>Fire Rescue Air Operations Facility</td> <td align="center">8/24/2018</td> <td align="center">$3,214,544.00</td> <td>EC Constructors</td> <td align="center">4</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1586-dbb-3-a.pdf" type="application/pdf; length=81002876"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1586-DBB-3-A</a></span></td> <td>101 Ash Street Tenant Improvements</td> <td align="center">8/21/2018</td> <td align="center">$17,080,261.00</td> <td>West Coast General Corporation</td> <td align="center">3</td> <td><a href="mailto:AngelicaG@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1707-dbb-3.pdf" type="application/pdf; length=13993770"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1707-DBB-3</a></span></td> <td>Miramar Landfill Gas Recovery Improvements</td> <td align="center">8/10/2018</td> <td align="center">$8,218,374.00</td> <td>NEO San Diego LLC & Aptim Environmental & Infrastructure, Inc.</td> <td align="center">1</td> <td><a href="mailto:BFriedenreic@sandiego.gov">Brittany Friedenreich</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1696-dbb-3.pdf" type="application/pdf; length=9021777"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1696-DBB-3</a></span></td> <td>Concrete Street Panel Group 1601</td> <td align="center">8/10/2018</td> <td align="center">$2,535,450.00</td> <td>Portillo Concrete, Inc.</td> <td align="center">5</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1740-dbb-3.pdf" type="application/pdf; length=22183879"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1740-DBB-3</a></span></td> <td>Rolling Hills Neighborhood Park ADA Upgrade</td> <td align="center">8/8/2018</td> <td align="center"> <p>$1,537,650.00</p> </td> <td>JMJ Construction</td> <td align="center">8</td> <td><a href="mailto:JEEspindola@sandiego.gov">Juan E. Espindola</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-6888-joc-3-a.pdf" type="application/pdf; length=18083780"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-6888-JOC-3-A </a></span></td> <td>Work In Private Property For Utilities Underground</td> <td align="center">8/1/2018</td> <td align="center"> <p>$15,000,000.00</p> </td> <td>Ramona Paving & Construction Corp.</td> <td align="center">3</td> <td><a href="mailto:angelicag@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1697-dbb-3_solicitation_final.pdf" type="application/pdf; length=13168121"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1697-DBB-3</a></span></td> <td>Rancho Mission Canyon Park ADA Upgrades</td> <td align="center">7/24/2018</td> <td align="center"> <p>$1,650,868.00</p> </td> <td>R.E. Schultz Construction, Inc.</td> <td align="center">8</td> <td><a href="mailto:angelicag@sandiego.gov">Angelica Gil</a></td> </tr> <tr> <td><span><a href="https://www.sandiego.gov/sites/default/files/k-18-1746-dbb-3_-_contract_document.pdf" type="application/pdf; length=28373022"><span><img alt="PDF icon" title="application/pdf" src="https://www.sandiego.gov/modules/file/icons/application-pdf.png"></span> K-18-1746-DBB-3</a></span></td> <td>Palm Avenue Transitional Housing</td> <td align="center">7/18/2018</td> <td align="center"> <p>$5,397,073.00</p> </td> <td>West Coast General Corporation</td> <td align="center">3</td> <td><a href="mailto:ASanFilippo@sandiego.gov">Antoinette Sanfilippo</a></td> </tr> </tbody> </table> <p>* NTE - Not-to-Exceed</p> </div> </div></div></div> <span property="dc:title" content="Construction Contracts FY2019"></span>

Construction Contracts FY2019

FY2020 Construction Contracts Awarded

FY2019:   Construction Contracts awarded for a total value of  

FY2018 Construction Contracts Awarded

FY2017 Construction Contracts Awarded

FY2016 Construction Contracts Awarded

FY2015 Construction Contracts Awarded

FY2014 Construction Contracts Awarded

FY2013 Construction Contracts Awarded

The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.

To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000.

To view a contract, click on the Contract Number for the desired project.

 

 

Contract Number Contract Name Award Date Award Amount Contractor No. of Bidders Contact
PDF icon K-19-1806-DBB-3 AC Water & Sewer Group 1013 06/27/2019 $13,321,934.12 TC Construction Company, Inc. 7
PDF icon K-19-1834-DBB-3 AC Water Group 1030 06/27/2019 $5,797,207.70 KTA Construction, Inc. 6
PDF icon K-19-1737-DBB-3 AC Water and Sewer Group 1042 06/21/2019 $8,190,400.00 S.C. Valley Engineering, Inc. 5
PDF icon K-19-1805-DBB-3 AC Water & Sewer Group 1027 06/19/2019 $5,772,761.00 Burtech Pipeline Incorporated 8
PDF icon K-19-1823-DBB-3 Mission Cliff Dr Water & Sewer Main Replacement 06/10/2019 $1,757,519.00 Piperin Corporation 8
PDF icon K-19-1799-DBB-3 Pipeline Rehabilitation AW-1 06/04/2019 $3,252,622.20 Burtech Pipeline 3
PDF icon K-19-1787-DBB-3 Sewer and AC Water Group 797 06/04/2019 $3,701,229.80 El Cajon Grading & Engineering Co, Inc. 4
PDF icon K-19-1795-DBB-3 Carmel Creek Neighborhood Park Improvements 06/03/2019 $1,023,849.51 Atlas Development 9
PDF icon K-19-1796-DBB-3 Slurry Seal Group 1923 05/30/2019 $2,668,208.87 American Asphalt South, Inc. 3
PDF icon K-19-1767-DBB-3 EB Scripps Park Comfort Station 05/22/2019 $3,217,646.12 Atlas Development Corporation 8
PDF icon K-19-1802-DBB-3 MBC Cooling Water System Chiller Upgrade 05/23/2019 $2,915,726.83 TechCom International, Corp. 9
PDF icon K-19-1794-DBB-3 Pipeline Rehabilitation AL-1 05/21/2019 $3,034,166.00 Southwest Pipeline and Trenchless Corp. 3
PDF icon K-19-1820-EMR-3 Cardinal Dr. Storm Drain Replacement 05/20/2019 $1,000,000.00 Flat Iron West, Inc. N/A
PDF icon K-19-1827-EMR-3 Emergency Construction Services For: Civic Theater Water Line 05/16/2019 $1,200,000.00 TC Construction Company, Inc. N/A
PDF icon K-19-1804-DBB-3 Sewer & AC Water Group 807 05/10/2019 $10,447,975.59 Burtech Pipeline Inc. 3
PDF icon K-19-1793-DBB-3 Richmond Street Sidewalk Improvements Project & Uptown Lining CMP Storm Drain 05/08/2019 $491,468.00 Crest Equipment, Inc. 5
PDF icon K-19-1831-EMR-1 3030 32nd St. Storm Drain 05/06/2019 $150,000.00 Burtech Pipeline, Inc. 1
PDF icon L-19-1782-DBB-3 ADA SW La Jolla Shores & Calle Corta 05/02/2019 $236,530.00 Blue Pacific Engineering & Construction 4
PDF icon K-19-1790-DBB-3 Sewer Group Job 830 05/02/2019 $567,768.40 Piperin Corporation 3
PDF icon K-19-1724-DBB-3 North City Water Reclamation Plant Expansion – Early Site Work and Ozone/BAC Relocation 04/23/2019 $16,403,300.00 AECOM Energy & Construction, Inc. 2
PDF icon K-19-1822-EMR-3 Florida Dr. Storm Drain Replacement 04/23/2019 $1,300,000.00 Hazard Construction Company 1
PDF icon K-19-1830-EMR-3 Wellborn Street Storm Drain 04/10/2019 $500,000.00 TC Construction, Inc. 1
PDF icon K-19-1781-DBB-3 Water and Sewer Group 967 04/09/2019 $813,469.00 Burtech Pipeline Inc. 4
PDF icon K-19-1828-EMR-2 South Woodman Storm Drain Emergency 04/09/2019 $500,000.00 Cass Construction dba Cass Arrieta N/A
PDF icon K-19-1819-EMR-3 1925 Burroughs Storm Drain Replacement 03/19/2019 $500,000.00 Granite Construction Company 1
PDF icon K-19-1816-SLS-1 Sole Source Construction Services for Repair Services for Alpha Project Homeless Shelter 02/19/2019 $105,852.29 Bill Thorpe Heating & Air N/A
PDF icon K-19-1766-DBB-3 Pipeline Rehabilitation AU-1 02/13/2019 $3,326,618.10 Southwest Pipeline and Trenchless Corp. 5
PDF icon K-19-1757-DBB-3 Sewer and AC Water Group 697A 02/08/2019 $4,910,682.06 Burtech Pipeline 6
PDF icon K-19-1780-DBB-3 Miramar Landfill Storm Water Conveyance Improvements 02/01/2019 $2,030,405.06 Dick Miller Inc. 4
PDF icon L-19-1771-DBB-2 Dulzura Conduit Repairs 01/30/2019 $328,500.00 New Century Construction Inc. 5
PDF icon K-19-1777-DB1-2 Furnish and Install New Laboratory Trailer at Pump Station 1 01/30/2019 $294,465.00 Martin Resnik Construction Co. 2
PDF icon K-19-1727-DBB-3 Curb Ramp Installation and Resurfacing 01/30/2019 $4,035,095.14 Superior Ready Mix Concrete, L.P. 4
PDF icon K-19-1785-DBB-3 Chollas Community Park Comfort Station 01/29/2019 $2,267,803.00 Marcon Engineering, Inc. 5
PDF icon K-19-1784-DBB-3 Mira Mesa Trunk Sewer Improvement 01/28/2019 $6,173,717.00 Orion Construction Corporation 4
PDF icon K-19-1762-DBB-3-A Bay Terraces Senior Center 01/23/2019 $3,990,606.00 Fordyce Construction, Inc. 6
PDF icon K-19-1560-DBB-3 California Tower Seismic Retrofit 1/22/2019 $4,710,500.00 SOLPAC Construction, Inc. 4
PDF icon K-19-1772-JOC-3 JOC S18 Sitework 01/22/2019 $5,000,000.00 Ramona Paving & Construction Corp. 4
PDF icon K-19-1814-SLS-1 Sole-Source Construction Services for Repair Services for Alpha Project Homeless Shelter 01/22/2019 $40,000.00 Tiffany Structures Inc. N/A
PDF icon L-19-1774-JOC-2 Job Order Contract (JOC)  SLBE SS18 Sitework 01/15/2019 $500,000.00 Moshiri Enterprises, dba Delta Builders 4
PDF icon K-19-1773-EMR-3 Ladera St Beach Access Stairway Coastal Bluff Stabilization 01/09/2019 $1,500,000.00 Orion Construction Corporation N/A
PDF icon K-19-1763-DBB-3 Otay Water Treatment Plant Basin No. 1 Concrete Restoration 01/04/2019 $1,170,625.00 Blue Pacific Engineering & Construction 6
PDF icon K-19-1503A-DBB-2 Camino Del  Este Path Crossing Improvements 01/02/2019 $360,000.00 HMS Construction Corporation 4
PDF icon K-19-1770-DBB-3 Slurry Seal Group 1902 12/21/2018 $2,348,232.04 American Asphalt South, Inc. 2
PDF icon K-19-1775-DBB-3 Pipeline Rehabilitation AP-1 12/13/2018 $2,027,181.79 Southwest Pipeline and Trenchless Corp. 3
PDF icon K-18-1691-DBB-3 Block 7G2 UUP 11/6/2018 $8,176,735.68 Southern Contracting Company 4
PDF icon K-17-1518-MAC-3 Multiple Award Design-Build Contracts (MACC) for Water, Wastewater, Stormwater Pipeline Projects 10/31/2018   Burtech Pipeline Inc.; KTA Construction, Inc.; Orion Construction Corporation; Shimmick Construction Company, Inc.; TC Construction Company, Inc. 6
PDF icon K-18-1750-JOC-3 M17 Mechanical Systems 10/26/2018 $4,500,000.00 DuWright Construction, Inc. 2
PDF icon K-19-1768-SLS-1 Wetland Restoration and Biological Monitoring Services for Famosa 10/23/2018 $170,000.00 Dudek 1
PDF icon K-19-1719-DBB-3 Pipeline Rehabilitation AO-1 10/22/2018 $3,074,886.10 Burtech Pipeline Incorporated 2
PDF icon K-18-1555-DBB-3-A Van Dyke Storm Drain Replacement 10/19/2018 $979,077.65 Cass Construction Inc. 10
PDF icon K-19-1764-DBB-3 DMP 1 & 2 Cycle Track Interim Implementation 10/19/2018 $2,011,719.53 Blue Pacific Engineering & Construction 1
PDF icon K-18-1747-DBB-3 Balboa Avenue Corridor Improvements 10/8/2018 $1,394,999.41 Dick Miller, Inc. 6
PDF icon K-18-1760-JOC-3 Job Order Contract (JOC) E17 Electrical Systems 10/8/2018 $4,500,000.00 Global Power Group, Inc. 3
PDF icon K-18-1755-DBB-3 Slurry Seal Group 1901 10/4/2018 $3,231,436.61 American Asphalt South, Inc. 3
PDF icon L-18-1733-JOC-2 SLBE TS18 Street Lighting/Traffic Signals 10/4/2018 $500,000.00 Southwest Traffic Signal Service, Inc. 4
PDF icon K-18-1711-DBB-3 Skyline Hills Community Park ADA Upgrades 9/14/2018 $1,674,620.00 Fordyce Construction Inc. 6
PDF icon K-18-1761-DBB-3 Sidewalk Replacement Group 1603 9/11/2018 $881,231.00 LC Paving and Sealing, Inc. 3
PDF icon K-18-1543-JOC-3

SP17 Street Paving for Capital Improvements Projects Only (NORTH Of I-8)

9/6/2018 $10,000,000.00 TC Construction Company, Inc. 4
PDF icon K-18-1543-JOC-3

SP17 Street Paving for Capital Improvements Projects Only (SOUTH Of I-8)

9/6/2018 $10,000,000.00 SRM Contracting & Paving 4
PDF icon K-18-1732-DBB-3 Fire Rescue Air Operations Facility 8/24/2018 $3,214,544.00 EC Constructors 4
PDF icon K-18-1586-DBB-3-A 101 Ash Street Tenant Improvements 8/21/2018 $17,080,261.00 West Coast General Corporation 3
PDF icon K-18-1707-DBB-3 Miramar Landfill Gas Recovery Improvements 8/10/2018 $8,218,374.00 NEO San Diego LLC & Aptim Environmental & Infrastructure, Inc. 1
PDF icon K-18-1696-DBB-3 Concrete Street Panel Group 1601 8/10/2018 $2,535,450.00 Portillo Concrete, Inc. 5
PDF icon K-18-1740-DBB-3 Rolling Hills Neighborhood Park ADA Upgrade 8/8/2018

$1,537,650.00

JMJ Construction 8
PDF icon K-18-6888-JOC-3-A Work In Private Property For Utilities Underground 8/1/2018

$15,000,000.00

Ramona Paving & Construction Corp. 3
PDF icon K-18-1697-DBB-3 Rancho Mission Canyon Park ADA Upgrades 7/24/2018

$1,650,868.00

R.E. Schultz Construction, Inc. 8
PDF icon K-18-1746-DBB-3 Palm Avenue Transitional Housing 7/18/2018

$5,397,073.00

West Coast General Corporation 3

* NTE – Not-to-Exceed